Enjoy the world

Chapter 371 The Public Stands on the Blue Sky Island

According to the formation diagram given by Old Man Yang, if you want to realize Hua Zhenxing's purpose of "borrowing the formation to make elixirs", everyone involved in the construction of the formation must be proficient in the art of nourishing the essence. It is better to use the art of nourishing the essence as the foundation of cultivation.

This time, it is necessary to mobilize more than 300 third-level Yuan Yuan masters, more than 50 Yuan Yuan masters who have at least broken through the fourth level, and of course the most important core strength is twenty sixth-level instructors.

Nearly four hundred people have all practiced the same method, have at least broken through the three realms of cultivation, and received the same system of standard training.

It would be difficult for any practicing sect to gather so many people who meet the requirements, but Huazhenxing can do it.

Manman, who came from Sanhu Town for the meeting, opened a small notebook and said: "As of last weekend's statistics, there are currently 411 registered third-level Yuan Masters in the Yangyuan Skill Center."

Xiao Guang added: "There are currently 68 registered fourth-level Yangyuan Technique instructors in Yangyuan Valley. This number does not include instructors of fifth level or above."

Hua Zhenxing sighed excitedly: "So many!"

Manman said truthfully: "Since the liberation of Wage City, and then the entire country of Jili, the number of people training at the Yangyuan Skill Center has expanded many times over the past year or so.

Judging from the same training time, the current success rate is actually lower than when we first promoted Yangyuan Technique. "

Hua Zhenxing shook his head: "The current talent acquisition rate is already very high, and the time it takes is not long. Don't forget that the first batch of Yangyuan masters we trained were all senior executives of Huanxiang Industrial and New Alliance, including many Shao is the backbone of the original straw shoe upper.

According to Master Ke, those people are the ones who created the current situation and are favored by the destiny of heaven and earth. Or simply put, the new destiny of this world is created by us together. It coincides with the emergence of the art of nourishing energy, so many people Can get started with cultivation and quickly break through.

The current group of people are actually the backbone of the new alliance. They have participated in the liberation and construction of Kilili Country. They are still determined by luck and the times, and their success rate is still quite high. "

Xiao Guang added: "In the future, our training scale will be larger, and the base of people who practice Yangyuan Technique will be wider. Even if the success rate is slightly lower, more Yangyuan masters will be trained one after another..."

Locke, the mayor of Fesoport City, had some doubts about Hua Zhenxing's grand gesture. He coughed and said, "Deploying at least three hundred level three students and fifty level four instructors from various places is not too much." Already?

Many of them hold important positions in various places. With so many being taken away at once, a lot of work may be delayed. Should we reconsider the plan? "

What Locke said was true, but Hua Zhenxing shook his head and said: "There are some difficulties, but it is not insurmountable.

According to the current cadre training system of the New Alliance, each core cadre must lead a team of at least five assistants to participate in practical work and study, and a succession plan should be arranged at any time.

This is a policy that has been in place since the days of the Kelin District, because our cadres will be deployed at any time to support work in the new liberated areas. As far as I know, this policy has not ended this year.

In the entire country of Kilili, if these 400 cadres were only transferred for three months, normal work would not be able to operate. This only shows that the organizational structure and governance system established by the new alliance have failed. I don’t think this problem will arise.

Yangyuan Valley and the Yangyuan Shu Center train construction talents at all levels who can unite to enforce orders and prohibitions, and fully mobilize effective resources to maximize effectiveness, rather than bureaucrats at all levels and localities who cannot command.

Moreover, the situation across the country has stabilized now, and work relies on organization, purpose, and rules, rather than personal cultivation. It is beneficial to transfer them back for three months.

They were not born to sit in the office and be leaders in the past, and they will not be able to sit in the office and be leaders in the future.

Local governance does not rely on the cultivation of Yang Yuan Shu. The cultivation of Yang Yuan Shu can only make people have abundant energy and a healthier body. But the current Blue Sky Cleansing Formation requires their cultivation of Yuan Yuan Technique.

This is not only building a large formation, but also an opportunity for comrades from all over the country to communicate and learn from each other, and it is also an opportunity for them to improve their cultivation.

How can I usually have the opportunity to practice with so many instructors and so many fellow disciples, build magic circles together, and be able to communicate and ask for advice at any time? The team that created the Blue Sky Washing Formation this time will be the core of Yangyuan Valley in the future.

We need to bring everyone together and collaborate with each other through common tasks. We still have many tasks to complete in the future, and the Blue Sky Washing Formation will never be just one. We can't rely on these people in today's meeting every time, right? "

Since Hua Zhenxing has reached a conclusion, of course it is him who has the final say. We should also pay attention to the problems pointed out by Locke, so everyone's job is to try to solve the problems.

The third-level students and fourth-level instructors affiliated to the Yangyuan Shu Center and Yangyuan Valley, except for those who are really unable to spare time, currently need to properly arrange the work at hand and spare the time for the three months before the end of the year.

Yangyuan Valley has held several training courses, each with fifty people, and the training lasted for two weeks. Many students who wanted to participate were unable to attend.

This collective task is equivalent to a three-month large-scale training class with more than 400 people. Almost all the instructors are present. How can we have such a good opportunity on weekdays?

From September 12th to the end of the month, the Takahashi Array and the Tianhe Array were completed, and the team to build the Blue Sky Washing Array was also assembled.

According to the list provided at the last meeting, there were 411 third-level students, 401 came this time; 68 fourth-level instructors, 63 came this time.

Coupled with level 5 and level 6 instructors, the team building the Blue Sky Washing Formation exceeded 500 people and rushed to the reservoir area in the upper reaches of the Beiluo River.

Five hundred people have to work there for three months, and logistical material support is also very important. Huanxiang Industrial has arranged many things in advance, and the necessary living materials will be continuously delivered regularly.

These five hundred people all had at least three realms of cultivation. They all started looking for a suitable place to build a temporary residence. It was unclear whether it was a work shed or a cave. They also built a number of permanent buildings that would be needed to garrison the Blue Sky Washing Formation in the future. They tried their best to design It is exquisite and elegant, while leaving enough room for expansion and transformation.

Many things in the world are like this. With a strong and powerful organization, it seems smooth and simple. But something that seems so simple is difficult for many people to imitate.

For example, when facing an epidemic, everyone can think of strict prevention and control measures as the most effective means. Some places do this, but some places can't even copy ready-made homework. It's not that they don't want to, but that they really can't do it.

The Lofogen Hydropower Station has not officially impounded water, but in the valley where the reservoir area is located, many low-lying areas are dotted with small lakes and wetlands.

The construction period of building the Blue Sky Washing Array was interspersed with the light rainy season after the light dry season. It is the most comfortable time in the Fiso Port area every year, and the scenery in this area is also very beautiful.

The Lofogen Hydropower Station, also known as the Lofogen Water Conservancy Project, is more than just a hydropower generation facility.

There are three sections of the dam, built according to the terrain, sealing the three passes between the four mountains. The southernmost dam is the main body, the longest and most important, and houses the generator set.

The dam in the middle section is where the diversion channel is located in the early stage of the project. This section of the diversion canal built for construction made two big bends in the mountain. The drop has been slowed down and the length has been increased a lot.

After the hydropower station is completed, the diversion channel will be transformed into two parts. The existing waterway will be built into a fish ladder, and another straight waterway will be opened with a flat sunken box, which can serve as an auxiliary flood discharge channel at special times.

In addition to fish ladders and auxiliary flood discharge channels, the middle section of the dam also has a water plant, which will provide water to the three towns of Tianhe, Gaoqiao and Xintian in the entire agricultural reclamation area in the future.

As for the third section of the northernmost dam, it is a pure dam.

The entire Lofogen Hydropower Station has a maximum dam of 68 meters, and the top of the dam is 173 meters above sea level. Because it is built at the mouth of a mountain range, the base altitude is more than 100 meters.

The straight-line distance from the main dam of the hydropower station to the mouth of Beiluo River is only fifty-five kilometers. According to climate and hydrological data, the annual flow of Beiluo River is 20 billion cubic meters, 70% of which is concentrated in the heavy rainy season and 20% in the light rainy season.

With such a large drop, such a short distance, such concentrated rainfall time, and such a large flow of water, during the heavy rainy season every year, the original Beiluo River area was a vast expanse of water, with water rolling into the sea.

During the long dry season, the river will dry up again, leaving only a few bead-like small water pools in some low-lying areas.

Huazhenxing's transformation of the Beiluo River Basin is to increase the meandering length of the Beiluo River to 150 kilometers by artificially diverting the flow and laying layers of shallow dams on the bottom of the water on the basis of retaining most of the natural river channels. Here, the flow rate also slows down greatly.

On this basis, three more wetlands were created using the natural terrain. Each wetland has a maximum water area of ​​dozens of square kilometers in the rainy season. Even in the dry season, 60% of the water area can be retained.

The most important step in the transformation of the Beiluo River Basin is the Lofogen Water Conservancy Project in the upper reaches. This project will install four 170,000-kilowatt generating units. According to Dongguo's technical standards, it is a large (2) type hydropower station.

Its total storage capacity is approximately 13 billion cubic meters. Taking into account the water that extends to the surrounding canyons after storage, the maximum area of ​​the total water area in the reservoir area will exceed 200 square kilometers.

At the highest water storage level, the water depth in the main reservoir area is between thirty and sixty meters, and the maximum water depth exceeds one hundred meters.

The dam is only 68 meters high. How can the maximum water depth exceed 100 meters? These are bottom-up storage capacities. Even if the dam opens and releases all the water downstream, patches of lakes and small wetlands will still remain in the valley.

Originally there were not so many low-lying areas in the reservoir area, and even if there were, they were not so deep. Hua Zhenxing led the students to dig them out deliberately.

Everyone built nine concave valleys to arrange the various formations of the Blue Sky Washing Formation. Before the Lofogen Hydropower Station was built to store water, it saved a lot of work and greatly reduced the difficulty.

The reservoir area is very large, and there will be many islands in the future. The so-called islands are the mountains that emerge from the water after the water is impounded.

The center of the Blue Sky Washing Formation is about six kilometers away from the dam. It will also be an island in the future. When the water level is at its highest, the island area is close to one square kilometer.

On this island, water quality, hydrology and other monitoring stations will be set up in the future, as well as water conservancy, aquatic products and other research institutions. At present, it is still a mountain peak in the valley. Land transportation is still smooth, making it easy to repair anything.

The center of the top of this mountain peak is slightly in the shape of a concave basin, surrounded by a circle of jagged and undulating hills. Hua Zhenxing led his teachers to build a spiritual pond here, which led to a clear spring.

The spring pool is not deep, almost knee-deep, and the area is not too large, about ten feet in diameter. The spring water gushes out from the rock formations, and the water outlet is on the east side of the pool. A section of canal is specially cut out between the rocks, and then flows down the mountain along the terrain.

There is no bridge in the spring pool, but there are large rocks with flat tops that will be exposed out of the water, dividing the entire spring pool into Tai Chi shapes. Stepping on this stone, you can walk to a pavilion in the center of the pool.

The pavilion has four pillars, but the top is round. It is located on a huge stone in the center of the spring pool. This boulder is more than three feet in diameter. If this spring pool will be like a lake on a lake in the future, then this boulder will be like an island within an island.

There is a four-legged round tripod in the center of the pavilion. This is not a conventional utensil shape (round tripods usually have three legs). It looks like a pot on a shelf. It seems to be made of metal and feels like wood to the touch.

There is a circular groove in the center of the tripod, which is where the pivot of the array is placed.

If it is a small sect, after the hydropower station is completed, just this island in the big lake can be used as the sect's dojo. Huazhenxing's thinking is very advanced, and his handwriting is even more amazing.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like