The Technology Tree of Xueba
Chapter 340 Power Distribution
The Xinghuo Technology Fusion Power Station is continuously generating electricity.
The DC power delivered by the thermoelectric generator is transported to the substation next to the nuclear fusion power station.
Through the conversion of the substation, it is converted into a standard AC voltage of 10KV.
Through the backbone power transmission network set up by the State Grid, the electric energy is transmitted to every household in China.
However, the grid-connected power generation of nuclear fusion power stations is indeed a major test for the national power transmission backbone network.
At Yanjing State Grid Headquarters, Chairman Cao Jun is closely watching the power distribution situation.
Huaxia State Grid ranks first in the world in power deployment capacity.
A country with a large amount of power generation is not a country with a strong power. Only when electricity can flow in an orderly manner in accordance with human commands, is it the sign of a country with a strong power.
If there is no ability to deploy power across regions, it will only result in excessive power in one region and insufficient power in another. This is going to have extremely serious consequences.
In the past 20 years, Huaxia has not had any serious electric power accidents affecting most parts of the country. This is the strength of the national grid.
Cao Jun is confident in completing the deployment of this huge power.
The nuclear fusion power station generates electricity and connects to the grid, and the moment when the nuclear fusion power station generates electricity and connects to the backbone network of power transmission.
It will have a great impact on the entire network. If this matter is not handled properly, it will definitely cause the paralysis of most of the national power transmission backbone network.
When nuclear fusion power plants are connected to the grid, the entire system of the State Grid will face major challenges.
Cao Jun asked Hu Xianguo, general manager of the State Grid Corporation of China, who was in charge of the power deployment: Old Hu, how are you preparing for the power distribution work? There is news from Xinghuo Technology that the nuclear fusion power plant will be activated soon.
Hu Xianguo said confidently: Old Cao, we have made sufficient preparations to ensure that the backbone network of power transmission will not be paralyzed after the nuclear fusion power plant is connected to the grid.
He took this opportunity to give Cao Jun a complete explanation of the plan they were going to implement.
The generating power of Xinghuo Technology's nuclear fusion power station is too large, and just this one nuclear fusion power station will account for more than 80% of the country's total power generation.
The State Grid has received instructions from the National Development and Reform Commission that when the nuclear fusion power station is connected to the grid, the country will eliminate all thermal power and nuclear power plants.
Only limited hydropower and new energy power generation are reserved for the exploration of new technologies.
The generating power of a nuclear fusion power station does not reach its maximum value in an instant, but changes according to a certain curve.
State Grid has used this opportunity to gradually remove other types of power plants from the grid, depending on the power generated by fusion power plants.
Cao Jun knew this plan before, because it was the only feasible plan.
If the electric energy of the grid load exceeds the standard, the excess electric energy can only be reduced.
Fusion power plants cannot be abated. That can only reduce thermal power generation and nuclear fission power stations that are harmful to the environment.
Hu Xianguo explained in more detail, such as their fast and precise control through quantum computers. Complete power compensation and power replacement work.
Cao Jun sighed: The most critical part of power deployment is that every step must be carried out according to the plan.
The power generation capacity of nuclear fusion power stations is too large. Once a certain power station fails to exit as planned, the margin of our entire system will reach its peak, and the system will be paralyzed.
We cannot shut down certain power stations in advance, because after these power stations are shut down, the power of the nuclear fusion power station has not yet been added to the grid.
It will cause a large-scale power outage accident, and produce a chain reaction, causing extremely heavy economic losses.
Hu Xianguo said with a serious expression: In this situation, we can only fight once.
We have cooperated well with Xinghuo Technology. In extreme cases, Xinghuo Technology's nuclear fusion power station will be disconnected from the national grid.
They will use their special power-consuming equipment to release the huge power generated by the nuclear fusion power station.
Even in such an extreme situation, it will not cause the paralysis of the national power transmission network.
However, once Xinghuo Technology starts this program, it means that the fusion power station has failed to connect to the grid for power generation.
In a short period of time, we simply cannot use the electric energy generated by nuclear fusion power plants.
We can only wait for technological breakthroughs and spend huge sums of money to upgrade our transmission backbone network.
Cao Jun's expression was completely relaxed, and he said with a smile: Xinghuo Technology still has this kind of preparation, I said that Chairman Zhou Yu never fights uncertain battles.
It is impossible for them to take the risk of destroying the national power grid and connect the nuclear fusion power station to generate electricity. They are indeed prepared.
In this way, we are much more relaxed, as long as we do our own work well.
Cao Jun was completely relieved. He was surprised how the National Development and Reform Commission could agree to such a risky thing.
It turns out that the risk of this matter is not great at all, at most it is that the nuclear fusion power station cannot complete grid-connected power generation.
He went to Southeast Asia some time ago to discuss the issue of China's power transmission with Southeast Asian countries, and he doesn't know much about the details of Spark Technology.
Boom! Boom! Boom!
A loud notification sounded in the office.
Hu Xianguo's eyes immediately became sharper. This is a signal that the Xinghuo Technology Nuclear Fusion Power Station is about to be connected to the grid for power generation.
Everyone cheer up and must race against time to complete the power deployment work.
The Xinghuo Technology Nuclear Fusion Power Station officially began to connect to the national grid for grid-connected power generation.
State Grid engineers began to stare nervously at various data.
They input various parameters into the quantum computer, starting from Nanyu Province to close the connection of thermal power stations to the national grid.
The power generation of nuclear fusion power plants has grown rapidly, and the load on the national grid has exceeded the standard.
When Hu Xianguo heard the news, he immediately issued an order: Open the peak power distribution system of the grid, and close the thermal power stations in other provinces as soon as possible.
If the power generation of fusion power plants continues to grow rapidly, other nuclear power plants will start to be shut down.
The State Grid launched the peak power distribution system, which is mainly to balance the power changes between the peaks and troughs of daily power consumption.
It uses high-energy-consuming industrial equipment to consume excess electricity by charging particle batteries.
The load of the State Grid is stabilizing.
There were smiles on their faces, and when they were about to finish the project, an accident happened suddenly.
Not good, the power generated by the nuclear fusion power station has risen sharply, and the peak power distribution system has no remaining power distribution capacity.
Cao Jun stared nervously at the load situation of the national power grid. He is now afraid that the entire power grid will be paralyzed.
Hu Xianguo was about to press the red button on the operating platform, requesting Spark Technology to start an emergency plan.
He suddenly found that the national grid load had returned to normal, and they had passed the most difficult hurdle.
Hu Xianguo immediately called out the last moment, how to solve the load situation of the national grid.
In the end, he discovered that it was the geothermal power stations across the country that suffered equipment damage and actively disconnected from the national power grid.
This should be because Xinghuo Technology discovered that the power generated by the nuclear fusion power station has increased rapidly, and actively disconnected the connection between the geothermal power station and the national grid.
Only in this way can the state grid's overload situation be lifted in an instant.
Hu Xianguo saw that the nuclear fusion power station has been integrated into the national grid, and the national grid is now running smoothly.
He said excitedly: Although there were unexpected circumstances, we succeeded.
You'll Also Like
-
Steel, Guns, and the Industrial Party that Traveled to Another World
Chapter 764 21 hours ago -
The Journey Against Time, I am the King of Scrolls in a Hundred Times Space
Chapter 141 1 days ago -
Start by getting the cornucopia
Chapter 112 1 days ago -
Fantasy: One hundred billion clones are on AFK, I am invincible
Chapter 385 1 days ago -
American comics: I can extract animation abilities
Chapter 162 1 days ago -
Cultivation begins with separation
Chapter 274 1 days ago -
Survival: What kind of unscrupulous businessman is this? He is obviously a kind person.
Chapter 167 1 days ago -
Master, something is wrong with you.
Chapter 316 1 days ago -
Swallowed Star: Wish Fulfillment System
Chapter 925 1 days ago -
I have a space for everything, and I can practice automatically.
Chapter 968 1 days ago