Skynet Architect
Vol 3 Chapter 111: Bad habits in the heart
Walking into the road, the black ground is in my eyes. The asphalt ground is covered with a small amount of finely divided mineral aggregates. The ground is flat and elastic, and the friction is increased a lot, which is enough for the vehicle to tell the road.
"Boss, our company needs to ensure the use time and quality of the pavement. The annual loss of our common road sections is about 2 cm, but we are now using the red a structure form that is commonly used internationally." Xu Kankan talked, it seems that he has learned a lot about highway knowledge recently.
He Sifan listened so quietly, the system in front of him had given him a lot of hints.
After all, he is engaged in architectural design, and pavement design is not within his knowledge. Now that I know so well, I know that a structure pavement is a structure that has only begun to be promoted in the mid-to-late 1990s, and has actually proved very durable .
The so-called a structure is to adjust the mix ratio of the asphalt mixture, increase the proportion of the coarse aggregate, and add a fiber stabilizer to form a special structure. It can be used for a long time without changing the performance. life.
This is where Si Fan is satisfied. Because after using the a structure, the quality here can still be guaranteed, and the durable time is 17 years according to the system judgment.
It's already 15 years on average, and that's enough.
Jian Sifan also knew that this time the asphalt concrete pavement was used. And it's rolling.
Asphalt concrete mixture is prepared by hot mix and hot spreading method. Its road properties are better, so the preparation process and raw materials are also higher. The equipment used is the huge roller that people often see from the road. Rolling like a stone mill, the mixture must pass through this process to be considered complete.
This kind of road is flat, dense, dust-free, and has a certain degree of roughness, so it has better driving comfort and appearance; and it has better aging resistance, abrasion resistance, temperature stability, and ability to resist driving damage. The service life is generally longer. Petroleum asphalt is used as the binder, and the overhaul period is usually more than 15 years.
The pavement used in the inspection is exquisite, the proportion is correct, and the materials are no problem. Such a pavement can really be used for fifteen years.
As for the pavement in the city now.
I can use it for five years and it is already high quality. There are a lot of roads renovated every year.
Smell the pavement smelling of heavy asphalt, Si Fan's mood is much better, this is a rare project that Skynet uses other engineering teams for construction.
And it can be considered a pleasant surprise to guarantee the quality, because the project price given by Sifan is just yet profitable, but the profit range is not very high. If it is normal construction and the company is profitable, then there is a problem. None, in the eyes of many people, it is an expedited normal project.
However, Si Fan was worried. He was worried about encountering the legendary connotation project. He scooped up the project money a little bit, and the construction cost was less than 3%. It is impossible to complete this project because the company After calculating the price and removing all the costs, the profit is about 2%, and the entire project can be overtime in a month.
"Let's go on. By the way, tell me how you arrange the supervisors and how to arrange all the preparations. The construction of this road is not cheap." Si Fan said.
This road is a serious road, and it is of a high standard. It's all about the standards that those people build.
Xu Xiaoxu said with a modest smile: "Boss, please rest assured. I will come here as long as I have time. I believe there will be no major problems in terms of materials and construction."
He said confidently. It ’s just that Si Fan is skeptical. He knows how much of this mess is. If you work directly in the office after graduation, you may not be exposed to that much, but he has been working in the field for so long. From top to bottom, they are up and down, big fish eat more, small fish and shrimp also have their own way of survival, everyone is profitable, everyone is taking advantage, but the project is abandoned.
But it doesn't matter, they have already done a good job. When the project is abandoned, they can pave the road again. A fish eats a dozen times, and the big guys are all fat.
br Just such a thing Si Fan absolutely does not want to appear in the place under his control, even now, he dare not guarantee the condition of the road.
"It's still early. Has the project been under construction for more than ten days? Half the road has been paved, let me see your results." Si Fan said.
Xiao Xiaoxu led the way and the two men walked on the road. At this time, Si Fan was completely handed over to the Skynet system, because the road conditions now look the same. At least the surface scenery. But what exactly is inside depends on the detection of the system.
For a full ten minutes, the ground they walked through was all qualified. Xiao Xu's face was a little smile, and Si Fan was happy walking ~ www.readwn.com ~ This is his rare Actually obeyed Si Fan's instructions to start a project. The company's decoration team is expanding every day, and even has reached the national scope, but the level of decoration has also been improved again and again, almost all of the high-end decoration is rounded, and each building material supplier and salesman is attached to Skynet's company. Your Majesty, they really want to eat this bowl of rice.
And if you want to enter the list of Skynet company purchase list, what must be done is quality, and according to the quality and brand Skynet company will take the initiative to price. If the previous manufacturer's pricing is too high, Skynet company will re-evaluate, if it can accept Continue cooperation, if it is not acceptable, cooperation will be stopped completely.
This is the style of Skynet's work. Naturally, it has also improved some quality products, but the price has been barely guaranteed.
严格 After strict quality control, it is to raise the prices of some companies to make them profitable at the same time.
司 On this highway, Si Fan almost already wants to believe that they will build a good road, at least it is a rare thing to complete under strict supervision.
But at this time, the system prompt appeared, and at the moment when the prompt appeared, Si Fan's heart was not full of anger, but ridiculous.
"Ding! There is a hidden danger in the quality, the asphalt quality is reduced, the aggregate quality is reduced, the laying thickness is greatly reduced, and the service life is greatly reduced."
Only a momentary reminder, the hope that had just risen in Si Fan's heart had completely collapsed.
You'll Also Like
-
NBA: The strongest physical talent, the inside is king
Chapter 318 18 hours ago -
The protagonist stole my spiritual roots? The heroine, give me a good birth!
Chapter 369 18 hours ago -
Slash the Red Eyes: Starting from the Double Kamui
Chapter 141 18 hours ago -
Simultaneous time travel: Sharing talents from Jackie Chan Adventures
Chapter 211 1 days ago -
Douluo: Huo Yuhao’s unorthodox life choices?
Chapter 181 1 days ago -
Douluo: I can upgrade my luck by traveling through One Piece
Chapter 160 1 days ago -
In the science fiction world, my vest is a mechanical god.
Chapter 184 1 days ago -
The Golden List: My Personal Maid is Jiang Yuyan
Chapter 483 1 days ago -
The lawyers who lie down to assist are forced to rectify the public security, procuratorial and judi
Chapter 84 1 days ago -
Entertainment: I never eat free food
Chapter 454 1 days ago