In the office, Xu Huasheng looked at the information seriously.

Now he has too many companies, and they are operated independently. Most of the time, Xu Huasheng doesn't care about the development of the company.

Xu Huasheng only knew about the Pakistan project before, but the specific planning was all done by Xingchen Energy Company, and Xu Huasheng directly delegated the power.

Now after reading the information, Xu Huasheng laughed.

Xingchen Energy Company won the mining rights of the Thar coalfield. The first project after winning the mining rights was a coal-electricity integration project.

Simply put, it is to build a power station and use the coal from the Thar coalfield to generate electricity.

This is a thermal power station project, but the scale of this thermal power station is a bit large and the technology is a bit awesome.

The thermal power station that Xingchen Energy is going to build in Pakistan has a planned installed capacity of 6.6 million kilowatts in the first phase.

The first phase of the project plans to install 10 660,000-kilowatt generator sets. This type of generator set is not only powerful, but also has high technology, because this generator set is the supercritical generator set developed by Huaxia Future.

Only with such technology can the inferior coal in Pakistan's Thar coalfield be turned into treasure. Not only that, the thermal efficiency of the entire supercritical generator set is also very high, reaching 50%.

This thermal efficiency is very high. You should know that ordinary generator sets can only reach 30% to 40%. At the same time, the supercritical generator set adopts low nitrogen oxide technology to reduce the formation of nitrogen oxides and other harmful substances by 65% ​​during the combustion process, and the desulfurization rate can exceed 98%, which can achieve the purpose of energy saving and consumption reduction and environmental protection.

According to this installed capacity and efficiency, the installed capacity of 6.6 million kilowatts and the thermal efficiency of 50% mean that this power station can generate 3.3 million kilowatt-hours of electricity per hour. In theory, this power station can generate 7,920 kilowatt-hours of electricity per day.

In theory, the annual power generation of this power station can reach 28.9 billion kilowatt-hours of electricity. However, in actual operation, it is definitely not possible to reach this number. It is very good to reach half.

But even so, this power generation is very important for Pakistan. You should know that during this period, the annual power generation of the entire country of Pakistan has just exceeded 30 billion kWh.

This power generation is too little for Pakistan, which has a population of 133 million. Now many Pakistani people still cannot use electricity, and even in areas with electricity, there are frequent power outages.

Compared with Pakistan, China's power generation has soared in recent years, and various power stations have sprung up like mushrooms after rain.

Especially thermal power stations and supercritical generator sets, which Xu Huasheng brought out a few years ago. The thermal power stations built by China in recent years basically use this technology. And a large number of patents have been registered and a large number of standards have been formulated. Now China is the authority in this regard.

The installed capacity of 6.6 million kilowatts is only the first phase of the project. In the future, according to demand, this power station will continue to expand its installed capacity, and then transmit the electricity generated here to other parts of Pakistan through ultra-high voltage transmission technology.

For Pakistan, such energy projects can directly drive the development of the entire country. More power generation means more industrial and residential electricity consumption.

At the same time, the price of electricity can be reduced a lot, which can quickly promote national development.

For Xingchen Energy Company, it is also a huge opportunity to make money. The policy given by Pakistan this time is very good. As long as the construction is completed, this power station will make money lying down.

In the future, according to the profit calculated by Xingchen Energy Company, the profit of this power station per kilowatt-hour can reach 0.2 yuan per kilowatt-hour.

If 20 billion kilowatt-hours of electricity are generated annually, the annual profit can reach 4 billion yuan. In the future, the annual power generation of this power station can even reach more than 100 billion kilowatt-hours. If it can reach 100 billion kilowatt-hours, the annual profit can reach 20 billion yuan.

Such profits, what else is not making money lying down.

In addition to power generation, the coal in the Thar coalfield can also be turned into coal chemical products. In terms of coal chemical technology, Xingchen Energy's technology is also very powerful.

For example, coal-to-oil, coal-to-gas and other technologies, Xingchen Energy's current technology is very powerful. The Thar coalfield has so many reserves and the price is cheap, so it is natural to make good use of it.

Of course, Xingchen Energy's technology is also used in China. Now China has imposed strict restrictions on the domestic energy industry. In the past few years, many small coal mines in China have been closed.

Although China has a lot of coal, it cannot be mined without restraint.

In recent years, China's economy has grown rapidly, and foreign trade has also developed rapidly. And it can be purchased from abroad.Cheap resources, so many of the originally planned energy mining projects have been shelved.

Whether it is coal, oil or natural gas, these things are the same. These things will never run away in your own home.

Besides, now China sells arms and high-tech products to foreign countries in exchange for cheap energy, and the purchase cost is even lower than the domestic mining cost. There is no need to mine it by yourself. These things are treasures for future generations.

After reading all the information, Xu Huasheng picked up the phone and started to contact Xingchen Energy Company.

There are not many things to explain about the investment, but Xu Huasheng’s main explanation is the security issue. Such a large investment must be jealous.

It may not be safe inside Pakistan.

"For such a large project, you can apply for the protection of the Pakistani military and list this power station as a military protection object. At the same time, you can hire the security team of the Hunter School..."

Xu Huasheng explained directly.

Pakistan must attach great importance to such a large power station. If this place is bombed, Pakistan will have nowhere to cry, so it is normal to send troops for protection.

In addition to the army, Xingchen Energy Company can also go to the Hunter School to hire a security team to protect the company.

The headquarters of the Hunter School is in Pakistan, and the scale of the Hunter School is not small now. There are almost 50,000 students in the entire Hunter School.

In addition to the students in school, there are many students in the Hunter School active around the world. Now if the Hunter School gathers, it can easily gather 100,000 troops.

These people are not ordinary soldiers. The training they receive in the Hunter School is the most professional training. The training of special forces in many countries may not be as cruel as the training of the Hunter School.

These elites may not be good at large-scale corps operations, but they are very proficient in special operations of small units. Xu Huasheng's attitude is very clear. Once someone attacks his own company, active attack is the best defense. Blood debts must be paid with blood. If you kill one of me, I will kill ten or a hundred of you. This will scare these people.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like