After Li Yue was transferred, Lou Zhenhua found another level 10 technician as his assistant. This was also a college graduate who had recently graduated. Because of his outstanding performance, he was promoted to level 10 technician.

"Mr. Xu, I'll get the blueprints!"

Fang Zheng arrived, and Lou Zhenhua's new assistant came quickly.

"These are all on the table, take them all away!"

Pointing to the drawings on the table, Xu Damao motioned him to take them all away and hand them over to Lou Zhenhua.

"Brother Li, tell me, what's going on? Why do you have to ask me to go with you?"

It was hard to guess what Li Xinmin wanted to talk to him about.

Besides, this guy is about to be transferred, how come he still has time to come and see me?

"The land for the construction machinery factory has been approved. I just want you to go over and take a look at how to lay out the site more reasonably in the future!"

Among so many workshops in the Red Star Factory, in Li Xinmin's opinion, the layout of the three final assembly workshops is the most reasonable and efficient.

Therefore, he wanted Xu Damao to help him look at the layout of the engineering machinery factory.

Of course, it would be even better if a detailed layout drawing could be produced.

"Aren't there specialized engineering designers for this? Have you asked them to design a plan first?"

The fact that he was able to intervene in this matter shows that Li Xinmin, the deputy factory director, has a lot of say there.

However, if someone has already planned this matter, Xu Damao is not going to intervene.

It's not easy to pretend to be cool and then get slapped in the face.

Regardless of success or failure, it will end up offending people.

"The land has just been allocated, and the planning and design has not yet been carried out. I just want you to help me take a look first, so that I can have a better idea when I carry out the relevant construction design in the future!"

Knowing Xu Damao's concerns, Li Xinmin expressed his own thoughts.

"If that's the case, then there's no problem. Let's go and take a look. If you have specific site data, I'll give you a rough plan tomorrow."

After all, he gave me one or two big red robes, he can't just talk about it, right?

By this time Fang Zheng had finished packing up the drawings and was ready to go out.

After Li Xinmin became the deputy director of the engineering machinery factory, he was provided with a car, so there was no need for two people to ride bicycles.

After about ten minutes, they arrived in front of a saline wasteland. A fence had just been built around it. It was obvious that the area enclosed was the future engineering machinery factory.

"Bulldozers and excavators must be produced in a coordinated manner. Brother Li, you should build an assembly workshop first, and then slowly develop other parts processing workshops, right?"

Even if a new engineering machinery factory is rebuilt, the companies that previously participated in the production of parts for these two types of equipment should continue to produce related parts.

As a result, what the engineering machinery factory urgently needs is to build an assembly workshop first.

"That's right. All the preliminary work will be completed before the New Year, and the assembly workshop will be built after the New Year. Before that, it is estimated that about 30 bulldozers will be assembled in the Red Star Factory.

As for the excavator, it depends on the progress here and the speed of Engineer Lou. "

The bulldozers have already been tested successfully, so it is impossible to wait until this side is finished before producing them.

Therefore, in the early stage, Red Star Factory still assigned a lot of assembly tasks.

"Well, the construction machinery factory has large vehicles and equipment entering and exiting. For safety reasons, people and vehicles must be separated. It doesn't matter if the door for employees is small, but the door for vehicles to enter and exit must be larger.

Especially to facilitate the entry and exit of larger vehicles in the future, it would be bad if the vehicles that cannot be produced cannot get out and the doors have to be removed at that time.”

When he just came in, Xu Damao was talking about all the superficial things.

"Let's go in and take a look. This place covers quite a lot of land, about 800 acres in total.

You have to plan it well!"

Li Xinmin also knew a little about what Xu Damao said, and they originally wanted to build four gates.

As for the function of the gate, there is no detailed division.

It took the two of them more than an hour to look around the entire venue.

"Brother Li, let's go back. I'll give you a layout drawing tomorrow morning."

After having a detailed understanding of this piece of land, Xu Damao was already confident.

As for the overall layout drawings, they were actually not that troublesome for him.

"Haha, okay, then I'll be waiting for your masterpiece, brother!"

When walking around and checking out this piece of land, Xu Damao made a lot of suggestions, but Lin Xinmin didn't know whether they were professional or not.

But he feels it is very reasonable, which is good!

When he returned to the Red Star Factory, it was already time to get off work. Xu Damao did not go back to the office. After taking a nap in the factory, he went home after get off work.

The next morning, after taking some time to draw Lin Xinmin's planning drawings, Xu Damao began to slack off and practice.

Whether it is Bajiquan or the Big Locust Tree Visualization Method, the maturity required to advance is getting higher and higher.

Therefore, he must make good use of some of his free time to practice.

As long as your work and life are sufficient, time will pass very quickly.

In the next two weeks, Xu Damao spent most of his energy on cultivation.

As for the final assembly workshop, there are three workshop directors watching over it and it runs very smoothly.

The drawings of the excavator have been drawn, and we are just waiting for the final assembly after all the parts are produced.

As for the assembly master in the experimental workshop, he was leading the personnel from the engineering machinery factory to assemble the bulldozer at this time!

Every week, twenty bulldozers can be guaranteed to roll off the production line. This speed makes Director Yang, Lou Zhenhua, and the senior leaders of the Ministry of Industry very satisfied.

However, this will put a lot of pressure on the engineering machinery factory.

An experimental workshop here has such production capacity. How much production capacity does your factory need?

If the difference is too big, their management will lose face!

Li Yue's special steel experiment is still going on, but the index requirements are higher, so it is not so easy to test it out.

Limited by the current technological level, even if Xu Damao has a better formula, he has no good solution if the production conditions are not met!

However, just during the Chinese New Year, a batch of pretty good special steel was produced and was directly designated by Lou Zhenhua and Pei Xinghua as special steel for tanks.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like