Siheyuan started as an unlicensed knight and became a hero of justice
Chapter 132 Factory Building and Workers' Building Completed
Wu Zhen also did not expect that the efficiency of building factory buildings and workers' buildings at the Red Star Steel Rolling Mill branch was so high.
In just over two months, less than three months, the factory building and workers' buildings were all completed.
This is mainly because the best time to build a house in Beijing is from March to May, when it is dry and rainy with suitable temperatures.
The busy farming season begins in June, so the work must be completed before June.
Everyone worked very hard, and people from all over the country came to help.
Men are responsible for the heavy work, while women lend a hand by doing porting and cooking.
The main thing is that not only is the salary high, but meals are also provided. More importantly, not only are meals provided to ensure you are full, but the white flour buns are actually made of standard flour, ensuring that there is meat for every meal.
So everyone works very hard, after all, they are provided with good food and meals. If someone is accused of slacking off at work, it would not only be a loss of face, but also the loss of this good job!
So after the Chinese New Year, in just less than three months, those factory buildings and workers' buildings were all successfully completed thanks to everyone's efforts.
After the Red Star Steel Rolling Mill branch was completed, the workers and advanced equipment that Wu Zhen was in charge of also came to the branch.
Workers who lived far away were also allocated dormitories, and some workers who originally rented houses in Beijing were directly allocated houses.
However, although it is a house allocated by the factory, I still have to pay rent to the factory. Of course, it is very cheap and is calculated based on the area!
The rent charge standard of Hongxing Steel Rolling Mill is 0.05 yuan per square meter per month for employees and 0.1 yuan per square meter per month for family members.
It is even cheaper than renting a shabby house from the housing management office, which can be considered a welfare provided by the factory to its employees.
However, the rent for family members doubled to 0.2 yuan in the second month, and became 0.4 yuan in the third month, and the regulations stipulate that they can only live there for a maximum of three months in a year.
The reason for this arrangement is to exclude those family members who come to live with their relatives and try to take advantage of the situation.
Because if they are parents, spouses, children, etc., then it is okay even if they live in a crowded staff building.
Anyway, because there are so many buildings, the Red Star Steel Rolling Mill does not have collective dormitories. Even the temporary dormitories for employees who live far away can provide each person with a room.
The practice of doubling the rent and evicting the family members within three months is aimed at those stubborn relatives among the family members!
After all, family members include parents, brothers, sisters, and children, and some shameless relatives will pretend to be family members and live in the family housing.
The factory had no good way to verify it, so there was no order without rules, so they just made this rule.
The largest and best building is the cadre building. The word "cadre" does not mean a position in the factory, but an administrative position. Only those with administrative positions or technicians and engineers are qualified to live in this cadre building.
Wu Zhen was given the title of engineer by the chief scientist, and was eligible to live in the cadre building together with his uncle Yi Zhonghai and his second uncle Liu Haizhong.
There are not many other people in the factory who are qualified to live in the cadre building. In fact, more than half of the middle-level cadres in the factory are not qualified.
The leaders who are in charge of the trade union and logistics but not production management are considered cadres, which was something Wu Zhen did not expect.
Most of the cadre buildings are empty, but they will not be so empty after a group of technicians and engineers arrive.
The most standard building is the staff building, but it is mostly empty now. After all, the branch factory has just been built and the only staff there are those who moved in from the old factory.
The family dormitory is slightly worse than the staff building, but better than the single dormitory. The difference is that there is an extra kitchen for cooking and eating, while the single dormitory only has one.
Unlike the cadre and staff buildings, the tap water and toilets in the family dormitories and single dormitories are shared on the same floor, but they are available on every floor, which is quite convenient.
You'll Also Like
-
Douluo V: I was reborn as a snake. It makes sense to have many children and more blessings.
Chapter 235 1 hours ago -
Siheyuan starts a 100,000-acre farm
Chapter 500 1 hours ago -
Naruto: If I ask you to practice gentle fist, will you drive a Gundam?
Chapter 162 1 hours ago -
Video debate: Starting from Ultra BOSS
Chapter 359 1 hours ago -
City: I will spread elves all over the world
Chapter 71 1 hours ago -
Transmigrated into a goddess from another world, and criticized the King of Yan for loving her like
Chapter 241 1 hours ago -
Crazy host sweet temptation, cold licking the main god and acting coquettish
Chapter 542 1 hours ago -
When Ultraman appears in reality, however:
Chapter 501 1 hours ago -
Siheyuan: Smiling at the Birds
Chapter 200 1 hours ago -
Pokémon: What should I do? My father-in-law always wants to tear me apart
Chapter 827 1 hours ago