Good luck! This village is full of billionaires
Chapter 097
Early June.
Rainbow Village.
New rural area phase 3, the 88th villa.
In the living room, Fang Yun was sitting on the sofa watching TV.
Qindao News host reported: “Today, Qindao officials spent 150 billion yuan to launch 45 major engineering projects.
These include the Laicheng-Qindao Expressway with an investment of 24.1 billion yuan, and the northern part of the central city with an investment of 21.9 billion yuan. Expressway, the Shenhai Expressway reconstruction and expansion project with an investment of 18 billion yuan, the Jiaozhou Bay Second Undersea Tunnel with an investment of 15.7 billion yuan, the Qindao to Beijing-Shanghai high-speed railway auxiliary channel railway with an investment of 12 billion yuan and other projects. These projects are all developed by
Caihong The Construction Co., Ltd. invited bids to undertake the construction, and it is expected to be completed and accepted within three months.
Next, please watch the detailed report……”
Saw this news.
Fang Yun nodded secretly.
Rainbow Construction Co., Ltd. has incredible infrastructure capabilities.
If you want to demonstrate your infrastructure capabilities, you must bid for and undertake a large number of engineering projects.
Nowadays, all the major projects in Qindao are contracted and constructed by Caihong Construction Group, which is undoubtedly a win-win situation.。
……
Fang Yun looked at it���After watching the news, switch the TV channel to Shandong TV.
In the TV screen.
The anchor reported: “Today, Shandong Province officially spent 420 billion yuan to launch 128 major engineering projects. In the
transportation field, including Jinan City Rail Transit R1 and R3 Lines, Jinan-Qindao Expressway Reconstruction and Expansion Project, Zhao-Heze Expressway, Jining-Liangji Canal Port and Navigation Construction Project, etc. In the
electric power field, it includes the Shandong Province 500 kV power transmission and transformation project, the new Linyi 800 kV converter station, and the 800 kV UHV DC transmission project in Shandong Province. In the field of people’s livelihood ,
it includes Jinan long-distance heat supply pipe network project, the first phase of Luzhong and Lubei oil pipeline projects, the Yellow Water East Diversion Emergency Project, Zaozhuangli Reservoir and other projects. In the field of science and technology, it includes
Shandong Shenghua Science and Technology Entrepreneurship Park, Rongcheng City Science and Technology Entrepreneurship Industrial Park, Weihai Lingang District Carbon Fiber Industrial Park R&D Center Project 23, Penglai Offshore Wind Power R&D and Testing Center and other projects. In the logistics field, including Heze E-commerce Logistics Industrial Park,
Weihai Fang Cross-border E-commerce Headquarters Industrial Park, Jiti Yantai Logistics Park, Zhaoyuan Agricultural Products E-commerce Wholesale City, Bincheng Comprehensive Logistics Phase II and other projects… All the above projects are bid and
constructed by Rainbow Construction Co., Ltd.
These projects, It is expected to be completed and accepted within three months!”
As soon as the news came out.
Fang Yun’s eyes lit up.
Rainbow Construction Co., Ltd. has moved from Qindao to Shandong Province.
With the infrastructure strength of the small mountains at a glance.
Rainbow Construction makes it easy to tender for a variety of projects.
They tendered 128 major engineering projects.
This is just the beginning!
……
After a while.
The time came to 19 o’clock in the evening.
Xia Guo news program is broadcast on time.
Host Kang Hui reported: “Recently, our country has launched a 400 million yuan super project-the Hongqi River Western Water Diversion Project! The
distribution of water resources in our country is seriously uneven. In some areas of the northwest, the rainfall is only about 300-400 mm, while However, the evaporation is as high as 1500-2000 mm, making it one of the most drought- and water-shortage regions in the world.
Compared with the northwest region, the southwest region of China has a humid climate, abundant rainfall, and very rich water and hydropower resources.
Only the Brahmaputra River, More than 300 billion cubic meters of water flow out of the Nu River and Lancang River every year, which is equivalent to at least 6 Yellow Rivers.
Since ancient times, from Dujiangyan, the Beijing-Hangzhou Grand Canal, to the Yellow River Embankment, to the Three Gorges Dam, and the South-to-North Water Diversion Project, we have been continuously constructing Various great water conservancy projects.
The Hongqi River Western Water Diversion Project, which has just been launched, refers to a large-scale project that transfers precious water resources from southwest China to the northwest region, including one main line and three main branch lines. This project
, The average water diversion capacity can reach 60 billion cubic meters, which can greatly alleviate the drought situation in the northwest region. The
Hongqi River Western Water Diversion Project is contracted and constructed by Caihong Construction Co., Ltd. and is expected to be completed within three months.
Undercurrents are surging all over the world, and Yanzi smiles The sky is high!
Once the water diversion project in the western part of the Hongqi River is completed, it will surely become an important event in the history of the development of the Chinese nation and a great cause of the great rejuvenation of the Chinese nation!” See this news
.
Fang Yun praised again and again.
The state invested 400 million yuan to build the century project.
Such a skill is simply as high as the sky.
The Hongqi River Western Water Diversion Project is the country’s only feasible plan to divert water sources from the southwest to the northwest under scientific, reasonable, environmentally friendly, feasible and economical conditions.
Unfortunately, this project is extremely difficult.
Even if Xia Guo is known as an infrastructure madman, it will take at least 12 to 15 years to build.
After the rise of Rainbow Construction Co., Ltd.
The country chose to hand over the construction of this super project to Rainbow Construction.
Once the project is built.
The water diversion project in the western part of the Hongqi River will benefit the present generation and benefit the future!
……
In the TV screen.
Host Kang Hui reported: “Recently, our country has officially launched the 1 trillion yuan super project-Mesh Water Hydropower Station!
Tibet Province has rich hydropower resources and is known as the Water Tower of Asia. It has unique advantages in developing hydropower.
Xia Guoke The hydropower resources developed are 678 million kilowatts, of which the hydropower resource reserves in Tibet Province are more than 200 million kilowatts, accounting for about 30% of the country’s total. The Mekong Hydropower Station is located
in the downstream bend area of the second section of the Brahmaputra River.
This area , the river section difference reaches 2350 meters, and the runoff reaches 60 billion cubic meters.
When the Merdeka Hydropower Station is built, a 35-kilometer-long giant tunnel will be built using the straight section of the river bend to divert water, and then constructed sequentially along the meandering valley of the Xirang River. There are 6 large hydropower stations, using a multi-stage power station model. The
total installed capacity of the Merdehydro Hydropower Station is 60 million kilowatts, with an estimated annual power generation of 300 billion kilowatt-hours, which is three times that of the Three Gorges Dam!
Once this century project is completed.
Merdehydro Hydropower Station It will surpass the Great Inga Hydropower Station in Africa and become the world’s largest hydropower station.
By then, the water flow from the Tibetan Plateau will be directed to Xinjiang Province, solving the water and electricity problems in the west and benefiting people from the four countries. The project will be tendered and constructed
by Rainbow Construction Co., Ltd. .
It is expected to be completed and accepted within three months!”
Saw this news.
Fang Yun took a deep breath.
As the project of the century, the Three Gorges Hydropower Station enjoys a high reputation in the world.
The trillion-yuan investment scale of the Mekong Hydropower Station is 28 times that of the Three Gorges Hydropower Station!
A dozen years ago.
The Momo Hydropower Station is in the demonstration stage.
Sooner or later the country will build.
The crux of the matter is.
The Merdeka Hydropower Station is extremely difficult to build.
The hydropower station site selection area is located at the junction of tectonic plates and has frequent geological activities.
Historically, there have been earthquakes of magnitude 8 in this area. (To read Baoshuang novels, go to Feilu Novel Network!)
Daily small landslides, mudslides, earthqua
kes, etc. are commonplace.
What’s more, Medog originally belongs to the Tibetan Plateau, and the construction difficulty is not comparable to that of the plains.
The super project was completed within three months.
In the whole world, Rainbow Construction Co., Ltd. has this infrastructure strength!
……[]
In the TV screen.
Host Kang Hui reported on the broadcast: “Today, our country officially launched a 319.8 billion yuan super project – the Yayu section to Lin section of the Sichuan-Tibet Railway! The
Sichuan-Tibet Railway, known as the project of the century, is a link between Sichuan and Tibet provinces The fast railway.
It runs east-west and is the second skyway into Tibet after the Qinghai-Tibet Railway. It is also one of the trunk railways in the southwest of Xia Kingdom. The Tibet Railway is
divided into three sections.
The first section is from Rongcheng to Ya Eucalyptus, with a total investment of 4.165 billion yuan and a total length of 140 kilometers.
The second section, from Lasa to Linzhi, has a total investment of 36.6 billion yuan and a total length of 403 kilometers. The
third section, from Yayu to Linzhi, has a total investment of 319.8 billion yuan. The total length is 1,011 kilometers.
The Yayu-Linzhi section of the super project launched this time has a total of 26 stations along the entire line, supporting the Chengdu and Linzhi operation support bases, all funded by the state. In addition to the main railway line, the project includes supporting temporary
construction There are 885 kilometers of roads and 2,000 kilometers of power lines. A panda habitat reserve has also been set up, with a design speed of 120 kilometers per hour to 200 kilometers per hour.
The project is constructed by Caihong Construction Co., Ltd. and is expected to be completed and accepted within three months.
At the same time, Caihong Construction Co., Ltd. will cooperate with Xiaguo Railway Construction Group to complete the unfinished sections of the Chengdu-Tibet Railway from Chengdu to Yayu and the section from Lasa to Lin within three months. After the completion of the entire line of the Tibet-Rongcheng Railway
.
The 36-hour drive from Lhasa to Lhasa will be shortened to 13 hours, promoting exchanges between Tibetan and inland provinces and driving the development of Lu and Tibetan provinces.……”
Saw this news.
Fang Yun praised again and again.
The Tibet Railway has complex geology and terrain, intertwined bridges and tunnels, severe mountain hazards, fragile ecological environment, and an altitude difference of more than 4,000 meters.
It involves geothermal gas, water and mud inrush, large deformation of soft rock and many unforeseen safety risks. Coupled with the plateau’s lack of oxygen and inconvenient transportation, the construction is extremely difficult.
However, the Tibet Railway can stabilize the stability of the southwest and is the anchor of the overall national security situation.
No matter how expensive the Tibet Railway is, it still needs to be built!
The strategic security significance of this railway far outweighs any economic cost.
After the Tibet Railway is completed, the Xinjiang-Tibet Railway will be completed, along with a connecting line to Yunnan and then to Nepal.
The all-weather transportation capacity of the Xiaguo Railway can ensure the national defense needs of the southwest and completely stabilize border defense.
And from the perspective of ordinary people.
It takes 13 hours to drive from Lasa to Rongcheng.
The Tibet Railway itself is a beautiful travel route.
Niubei Mountain, the largest 360-degree viewing platform in Asia, Gongga Snow Mountain, the King of Shu Mountains, Xindu Bridge, a photography paradise, the highest urban settlement in the world, the deepest canyon, the Yarlung Zangbo Grand Canyon, Bomi, the home of the most beautiful glaciers, and Mo, a paradise for hiking Tuo, are all located on the Xizang Railway.
By then, the Tibet Railway can also boost the economies of the two provinces.。
……
In the TV screen.
Host Kang Hui continued the report: “In addition to bidding for the construction of three world-class projects, namely the Chongqing-Tibet Railway, the Mekong Hydropower Station and the Hongqi River Water Diversion Project, Rainbow Construction Co., Ltd. also invited bids for six super projects. First,
Rainbow Construction Co., Ltd. invited bids for the Bohai Strait cross-sea channel with a total investment of 260 billion. This project uses a combination of cross-sea bridges, undersea tunnels, and bridges and tunnels to build a direct and fast channel across the Bohai Strait to smooth the north-south traffic in Xia.
Chapter 2. Rainbow Construction Co., Ltd. invited bids for the Qiongzhou Strait cross-sea channel project with a total investment of 150 billion. This project connects Leicheng Peninsula and Hainan Island, connects Beibu Gulf to the west, and the northern part of the South China Sea to the east. It is connected to a road and railway A dual-use cross-sea channel.
Third, Caihong Construction Co., Ltd. invited bids for the Jiangxi-Guangdong Grand Canal with a total investment of 150 billion, with a total length of 1,300 kilometers, connecting the Yangtze River to the north and the Pearl River to the south, crossing Poyang Lake and the main stream of the Ganjiang River, and spanning The two provinces of Jiangxi and Eastern Guangdong are comparable to the Beijing-Hangzhou Grand Canal.
Fourth, Rainbow Construction Co., Ltd. invited bids for the Foshan-Guangzhou-Dongguan intercity subway with a total investment of 120 billion, with a total length of 317,126 kilometers, connecting Fucheng, Yangcheng, and Guancheng. The central urban area and connected with the intercity related routes of the Shenzhen metropolitan area have become the horizontal axis of the Bay Area.
Fifth, Rainbow Construction Co., Ltd. invited bids for the Shanghai-Zhouzhou-Ningbo cross-sea passage with a total investment of 100 billion, with a total length of 65 kilometers, connecting the Magic City Du, Zhoushan and Ningbo can shorten the four- to five-hour drive between the two places to more than two hours.
Sixth, Rainbow Construction Co., Ltd. invited bids for the Pinglu Canal in western Guangdong with a total investment of 72 billion yuan. 140 kilometers, it can expand the water transportation hinterland of Nanning, soar the value of the deep-water port in Beibu Gulf, and make western Guangdong a true coastal identity. All the above
projects will be completed within three months!”
……
Check out a series of news.
Fang Yun was very emotional.
Rainbow Construction Co., Ltd. has the aura of speed, quality, and design capabilities of village construction projects, and has become the most powerful infrastructure company in the world.
Projects that other companies take years to complete.
Rainbow Construction Co., Ltd., it only takes up to three months!
have to say.
This speed of infrastructure construction is incredible!
At once���Take the Three Gorges Dam as an example.
Construction of the Three Gorges Project started in 1994 and was completed in 2006, which took 12 years.
This is not an ordinary 12 years, but the 12 years of an infrastructure maniac!
If the construction of the Three Gorges Dam starts now.
Rainbow Construction Co., Ltd. only needs three months to complete the project, which is a mess.
In Fang Yun’s eyes.
Rainbow Construction Co., Ltd., with such exaggerated infrastructure capabilities, should not just do it to make money, but should participate in the development process of the country’s rise and benefit the residents of Xia Kingdom.。
……
After the Xia Guo news program ended.
Rainbow Construction Co., Ltd. is crazy and dominates the hot search list on the entire Internet.
The real-time hot search list has high and low gold content.
Ordinary hot searches rank first, and netizens will be done with it in two days.
And this time there are nine super projects.
The merit lies in the present time and the benefit lies in the future.
All netizens gave their unanimous praise to Rainbow Construction Co., Ltd.。
“Oh my God! Rainbow buildings are crazy!”
“Xia Guo’s infrastructure is mighty, and he is worthy of being an infrastructure madman!”
“Li Liyuan’s score! Rainbow architecture is incredibly powerful!”
“9 super projects benefit the country and the people, and the rainbow architecture is unparalleled in the world!”
“A village-run enterprise actually surpassed the five giants of Yangqi Construction in the field of infrastructure construction?”
“All the super projects were built within three months, which is simply outrageous!”
“I have a hunch that Rainbow Construction Co., Ltd. will become the most awesome company in the world’s construction field!”
“Not only that, the country has spent so much money on infrastructure this time, and our national strength will also rise to the next level.。”。
You'll Also Like
-
Naruto: Dark Night Shura
Chapter 259 1 hours ago -
Naruto: Hashirama's Son, the New God of Ninja World
Chapter 256 1 hours ago -
Gao Wu: Devour the reborn and gain the power of destiny
Chapter 226 1 hours ago -
Bringing the system to Pirates
Chapter 204 1 hours ago -
The only profession of the Emperor class! Pulling people into the closed beta test at the beginning
Chapter 215 1 hours ago -
Sign in with a war god sister at the beginning
Chapter 206 1 hours ago -
The rebirth of a small town, starting from birth
Chapter 159 1 hours ago -
NBA: Traditional basketball, you play 3-pointers
Chapter 139 1 hours ago -
Immortal Path Evergreen
Chapter 1 hours ago -
Douluo: Rebirth Yuhao, they all have evil intentions
Chapter 71 1 hours ago