Rebuild Dinosaur Island

Chapter 129 Infrastructure (for collection)

Chapter 129 Infrastructure (for collection)

After calm down.

Li Yan hurriedly opened the door, walked through the front yard, and came to the iron gate.

When Zhao Jia saw him, she squinted her eyes, then raised the baking tray in her hand, and smiled a little darkly.

"you are too polite."

After pressing the iron door, Li Yan took the baking tray, which was filled with biscuits in the shape of Peppa Pig. Maybe it was because it was just taken out, but the baking tray was still warm, and a strong milky aroma wafted out of it. .

Not to mention, the baking is quite delicate, it's hard to imagine that a little girl can make this.

"It doesn't matter, you just think that I baked too much, I can't eat it, it would be a waste, and I brought it to you by the way."

Zhao Jia waved his hands, then tilted his head slightly, took a sneak peek, and asked, "Little brother, do you live alone?"

"You should call me Li Yan"

Li Yan's ears went numb, and he said politely, "It's a person, why don't you come in and sit for a while?"

"How kind is it to call my little brother?"

The corners of Zhao Jia's mouth curled slyly, and then he coughed twice, pretending to be serious: "No, no, I have to go back and tidy up the oven. Let's talk about it when I have time?"

"Okay, thanks again for the biscuits!"

Li Yan waved his hand, looked at the back of the little girl Pianzi leaving, then looked at the little biscuit, shook his head and smiled.

After returning, he took two simple bites. The milk was crispy and sweet, and tasted good.

After filling his stomach, he immediately packed up and then drove to the company that manufactures wind power.

That is the Songjiang District of Shanghai, which belongs to the suburbs and is very far away from Tomson Golf.

Li Yan drove almost two hours to get there.

It looks like an industrial town, with large blue and white iron-tiled factory buildings everywhere.

However, he still saw the huge white windmill at a glance. It was similar to the one made by the State Grid, but it was slightly smaller and stood in a factory, which was very conspicuous.

And this factory is exactly the one that Li Yan contacted on the Internet.

When he arrived at the gate of the factory, he called the contact person, and then a male manager in his 40s, wearing black-rimmed glasses, a plaid shirt, and dark gray trousers came out.

After a brief conversation.

The black-frame male manager led him to visit the factory equipment and core motors, as well as various spare parts, ranging from small to large, with various power generation specifications. The logistics charges are based on the area, and the package is assembled on the ground, saving worry and effort.

Li Yan picked around, roughly estimated the power consumption of the territory, and decided to buy a bigger one, so he chose the motor with a power generation capacity of 1.5 megawatts.

It runs for one hour and can generate 1500 degrees of electricity. The climate in northern Laos is dominated by tropical rain forests, and the wind is average, but it can basically guarantee an average operation of at least three hours a day.

The general electricity demand of factories is about [-] to [-] a month.

That is to say, with the addition of an emergency hydroelectric power generation equipment, it is enough to support the entire research room, and even the village's electricity can be supplied.

Therefore, Li Yan made a decision on the spot, and asked the eye-eyed man to recommend hydroelectric power generation. Unexpectedly, he bought three high-power diesel generators in the factory next door, all in case of emergency.

Due to the high cost of international transportation, 5.00% of the freight was added in the end. One 1.5MW wind power generator, one 800kw hydropower generator, and three 500kw diesel generators were packaged, transported and installed together, and the total cost was more than 500 million.

Among them, wind power generation is the most expensive, accounting for more than 80.00%.

After talking about the generator, he went straight back to the research institute in Zhangjiang Hi-Tech Park.

On the one hand, it is to continue to study the DNA sequence of the dodo bird, and on the other hand, it is to contact the satellite receiver.

Because the black-framed male manager of wind power generation said that high-tech industries such as satellite reception, integrated circuits, and semiconductors are basically concentrated in Zhangjiang High-Tech Park.

and so.

Inquired around.

Li Yan finally bought an industrial-grade satellite receiving equipment from a civilian satellite information company in the park, and also rented the global satellite network service of Musk Satellite Company of the United States for three years.

The speed of satellite Internet access is about three to five times that of civilian Internet, but again, the price is also very expensive, as high as 500 US dollars a month.

Although the price-performance ratio is not high, there is no way. This method can only be used in the deep mountains and old forests.

Satellite receiving equipment cost more than 70 yuan.

Counting the previous generators and yesterday's laboratory equipment, Li Yan has spent less than 1000 million in just one day.

have to say.

Infrastructure is really expensive.

At this moment, he realized how much money a backward country would spend if it wanted to change infrastructure such as transportation, electricity, and the Internet!
Electricity and signal are solved.

The rest is the construction of the research institute. This is easy to do. You can just go to Yundian and find a construction team to complete it.

So, he hurriedly booked a flight ticket to Kunming tomorrow.

When I got home, it was already seven o'clock in the evening.

Li Yan took a brief shower, and when he was about to cook, he realized that the biscuits that Zhao Jia gave him were still on the coffee table in the living room.

Thinking of leaving tomorrow, he found a plate, poured the biscuits in it, and then took the baking sheet to return it to the little girl.

who knows.

Li Yan walked to her house and rang the doorbell for a long time, but a middle-aged woman in a brown apron came out.

"Hello, is this Zhao Jia's home?"

"Yes, but she's not at home now, what can you do with her?"

He estimated that this woman should be a servant hired by Zhao Jia's family, so he handed over the baking tray, "Oh, it's nothing, she sent me some biscuits this morning, here's the tray, return it to you."

"Okay, I'll let her know."

After returning the baking tray, Li Yan went home.

Early the next morning, he made an appointment for a car, went to Hongqiao Airport, took a flight for six or seven hours, and finally arrived in Kunming.

Because of the unfamiliarity of life.

Li Yan had no choice but to contact the agent who helped him buy the land before: Liu Xin.

Because they were all related to real estate, he quickly recommended a state-owned construction team who had a lot of construction experience in Laos and Burma.

and so.

The next day, he went directly to Liu Xin and contacted the supervisor of the state-owned construction contractor. After talking for more than half an hour, he finally received an expected quotation of around 500 million yuan for a five-storey building covering an area of ​​150 square meters. Institute, including the elevator system, and the basic hardware.

The reason why it is so expensive is mainly due to cross-border labor and transportation costs.

Of course, the specific price can't just be talked about with words, it has to be inspected on the spot.

and so.

After paying the deposit, the contractor assigned a project cost and chief designer, as well as two clerks, to accompany Li Yan, and planned to go to Fengshali to have a field look.

 The first update, there will be four more soon, please collect and recommend!
  


(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like