Chapter 385

Although there are various unsatisfactory aspects of the decoration, the "Coach Zhou" couple do not regret it.

Especially when I heard from some relatives and friends that I bought a house from a major real estate company. When the owner renovated the house, he wanted to wash the ground with water to wash away the "floating dust" so that he could install concealed wiring and pave floor tiles—— He was actually blocked by the "property management" of the community.

Asked the reason, it was said that the owner had put a lot of water to wash the ground before, which resulted in water seepage in the sky of the downstairs floor.Damaged the plasterboard ceiling on the lower floor.

It's okay if the "property" is not explained. Once explained, relatives and friends immediately think of the floor of the "property" house. How bad would it be? !It's not long before the floor of the newly laid floor, and it's not the top floor, even a little water will leak!
Sorry to say so!

"Coach Zhou" doesn't have much confidence in the properties developed by the so-called big real estate companies.

Fortunately, the "Evergrande" hardcover house that "Coach Zhou" and his wife bought in the early years is still reliable in quality.Not to mention how good the quality is, at least I have lived here for more than 20 years, and I haven't seen any major problems with it.

Another one is the large-sized "house" here that "Coach Zhou" and his wife chose for their eldest daughter.Although it has gone through twists and turns and became an "unfinished building" for more than 8 years, it finally found a new boss who was willing to take over. Since then, it has "turned over" and successfully revived.

Finally, I was able to get the house that I thought was hopeless, and I could happily enter the "decoration" stage. During the decoration, I didn't have to worry about "leakage" after just flushing the floor with water. " Coach Zhou” and his wife are generally satisfied.

The mere hanging "marble" did not achieve the expected decoration effect.It is not surprising that your "budget" is far lower than the "rich people" who have a house full of high-end stones, and the effect is greatly reduced.

A small "real estate" built by a small real estate company that "has come out of the mountain" can ensure that there are no major problems in quality, and that's almost the case.What higher demands could there be for it? !

Like the current large-sized "new house", the "Coach Zhou" couple dare to decorate boldly, and they don't worry about some fatal decoration quality problems.

"Coach Zhou" and his wife chose the cheapest "granite" in choosing the "stone" for hanging the wall, but he spent a lot of money on the overall decoration of such a large-sized house.

For example, indoor water and electricity projects are all equipped with "hidden pipes" and "hidden wires".If it is a "self-built house" decoration, the labor cost is generally 18 yuan per square meter.In the city, a three-story building of nearly 3 square meters costs 400 yuan just to install "hidden wires."

If it is a two-story self-built house in the countryside, the general area is about 250 square meters, and the labor cost of installing the "hidden line" is about 4500 yuan.

Of course, you can also choose to install "open thread", which is much cheaper, as long as 6 yuan per square meter of labor.

"Self-built houses" generally choose to install "open lines" because of their larger area.There are fewer "dark lines".

The opposite is true for "commercial housing", because the area of ​​"commercial housing" is not much larger, and most of them have "hidden wires" installed, but very few have "exposed wires" (like the "large-sized" house purchased by "Coach Zhou" should be considered large). Yes, it’s only 160 square meters. It’s smaller than a “self-built house”).

And the master who installed the water and electricity is also shrewd. If the "self-built house" has a large area and few people install "hidden wires", he will "discuss square numbers" with the owner to calculate the "labor cost".And what about "commercial housing"?If there are multiple people installing "hidden wires" and the area is small, they will not discuss the squares with you, but will directly calculate the labor by discussing the sets.

Taking the county where "Coach Zhou" is located as an example, the labor cost for installing hidden wires in "commercial housing" here ranges from 3000 to 5000 yuan per commercial house.

Mainly look at "two-bedroom"? "Three-bedroom"?Or "four bedroom"?
For example, "Coach Zhou" and his second wife bought a commercial house with "two living rooms and five bedrooms" for their eldest daughter. They had to add an additional price on top of the original price. It would cost at least 6500 yuan in labor before they would build the whole house for you. The "hidden line project" of the house.

This does not include the cost of materials for "installing hidden wires".Buried PU tubes, buried a few square meters of copper wires, all kinds of switches, all kinds of lighting...all of these need to cost a lot of money.

Labor and material costs, just to reach the level of "electricity" that can be used in the whole house, will cost at least 2 yuan.

"Coach Zhou" spent 3 yuan to fix the "electricity" of the commercial housing.The reason why he spent more money was not only that his suite was larger, but also because he invested a lot in "lighting".

Although the stones hanging in the two living rooms are "grass stones", they can be called the "hanging stones" of the whole house... In the eyes of "Coach Zhou" and his wife, this is very "forceful". It needs to be placed in the living room. Hanging a multi-layer "crystal chandelier" is a good match.

And the price of this "big crystal lamp", the moisture inside is quite deep. The cost of "purchasing" is about 2000 yuan for "lighting", and merchants dare to sell it for 4 or 5 yuan.If you meet some upstarts who are "stupid and rich", they may kill you tens of thousands of yuan.

Although "Coach Zhou" and his wife have always been known for "careful planning and careful planning".But the couple has a "weakness", that is, they never "shopping online".I don't know that the "lighting" on the Internet is of high quality and low price.

The two of them spent a lot of money on "lighting". "Budget overrun", that is also reasonable.

There is also the water installation project.

People "self-built houses" have many bathrooms, and there are generally 6 bathrooms on the third floor, 2 on each floor.Even if some people don't want to build more, and build one bathroom on the first floor, there are still three.The labor cost of filling water in this "self-built house" is calculated according to the "number" of bathrooms.The labor for each bathroom is 1 yuan.If there are 1 bathrooms in a 3-story building, it will cost 800 yuan of labor (it is said that the fee is based on the number of "bathrooms", of course it is not limited to the water flow of the "bathrooms". However, the toilets in the bathrooms "Water access" is more complicated, and it has to include "secondary waterproofing", installing squat toilets and other projects).

If you have only 3 bathrooms in a "self-built house", then the labor cost of installing water only needs to be 2400 yuan.

When it comes to "commercial housing", the number of "bathrooms" is not counted with you, and the labor cost of "water filling" is counted.Also on the set to calculate.Of course, commercial housing with more bathrooms requires more labor.If there are few toilets, the labor for plumbing is cheaper.

If the "proprietor" has objections and wants to calculate labor according to the number of "bathrooms", that's fine.But for each "bathroom", the master of other people's decoration will charge more than when "self-built houses".Sometimes it is possible to "double" the fee.

All of these have pushed up the cost of "commercial housing" decoration.

There is another problem that makes the "owner" helpless.That is, all these "commercial housing" renovation labor costs do not include the "material" "moving fee".

In "self-built houses", there is generally little additional cost of "material handling".

Whether it is installing water and electricity, or laying tiles... Generally, it is enough to move the materials to the first floor.

This "commercial housing" will not work in this way.Especially the "commercial housing" on the elevator high-rise, like "Coach Zhou" also bought a high-rise on the 29th floor (the total number of floors is 31 floors. The 30th floor is not considered the top floor. He chose the 29th floor, which is safer and does not have to worry about rainy days. Water leaks, too hot on a hot day. Therefore, only the "top floor" is a special price room, and floors below the top floor and floors above 2 floors are not "special price rooms". You have to increase the price on the basis of the "average room price" before you can buy it to miles).

"Coach Zhou" bought a "commercial house" on the 29th floor. During the renovation, the labor cost of "moving" was a huge additional expense.

For example, when moving cement, the "moving fee" for each package of cement costs 1 yuan to move one floor.If you move up to the 1th floor, then you have to pay 29 yuan for labor to move a bag of cement.

Obediently.This 1 pack of cement, 425 grade, even when the price of cement is high, it only sells for 26 yuan per pack - this "moving" to the new home on the 1th floor of "Coach Zhou", the "moving" of "each pack" fee", which is more expensive than the price of cement itself.

This is actually not surprising.

It is not allowed to use the "elevator" for the "handling" of the decoration materials on the upper floors of the elevator. It can only be carried by hand and take the stairs.As a result, the "massive owners" who are delicate in body, who is willing to do this "manual work", can only hire someone.

Now labor is so expensive.

Insanely expensive.

"Cement" is just an example. The entire decoration process involves many processes and uses various building materials, too numerous to mention.And the dosage is very large.

In this case, an astonishing amount of "building materials" had to be "carried" upstairs manually, and the expenditure on "labor" was astonishing.

Only the "hardcover houses" of large real estate companies can greatly reduce the cost of "decoration" due to the large-scale use of "hanging towers" to mechanically "handle" bulk building materials.

"Coach Zhou" doesn't want to directly arrange a "hardcover handover". Just for this cheap "pre-sale house", he "wasted so much time" and endured "how much mental suffering"? !

Today, "hard work is rewarding", but he needs to invest more money in "decoration", and personally act as a "supervisor", and he needs to invest more in mental and physical strength.But looking at their own house, they are getting closer to their "satisfaction" day by day. No matter how hard and tired the "Coach Zhou" couple are, they still have a feeling of "joy in it".

Anyway, the "aesthetics" of his husband and wife are also very different from those of the younger generation.Like those cheap "grain stones" on the wall, if you are a young person, you would rather "scratch the white" than appreciate this kind of "grain stone" hanging on the wall.

But from the perspective of "Coach Zhou" and his wife, I think this kind of "hanging stone" is quite interesting.Nothing feels wrong.

From the perspective of "Coach Zhou" and his wife, it would actually look pretty good even if they hired an electrician to install the "open wiring".In the old house, there was only one "neutral" wire and one "live wire" for power supply, and they were installed directly on the wall, and there was nothing unsightly about it.Later, even if the wire installation method was "open wire installation", a white "wire box" was used to contain the wires of two colors. "Coach Zhou" and his wife thought it looked very good.

The reason why the new "commercial housing" is still "following the trend", according to the "owners" of most commercial housing, with hidden lines, the biggest consideration of "Coaches Zhou" and his wife is that "the whole house is hung with stones" .

After using "marble" as the wall, it is basically impossible to "nail wire boxes" ("open wires" are used to install wires) on the "stone".

There are also electricians who are so stupid and try to "nail a wire box" on the stone.Marble is not only hard, but it is difficult for nails to "knock" in.Even if you try your best and can occasionally knock some "cement nails" in, you still have to make a lot of "potholes" on the surface of the "marble".

That's really "ugly".

We can only install "hidden lines" in advance before "hanging stones" on the wall at the beginning.After installing the "hidden thread", come to "hanging stone" - in this way, they will not affect each other.

It's just that the labor cost is very expensive to install the "hidden thread".If you install "open thread", at least two-thirds cheaper.

The reason why the "dark line" installation is expensive, of course, has the effect of "expensive".

To fix the "hidden wires", the "wire slots" on the wall must first be opened. The opening of the "commercial housing" wire slots is a "serious dust-eating" job.Eating too much "dust" from the decoration construction site is how pneumoconiosis comes about.

Therefore, those masters who install hydropower are relatively "love their lives and cherish their lives", preferring to "outsource" the process of "opening the wire slots" rather than going into battle easily by themselves.

The cable ducting in this "commercial building" is also charged per set.Generally, it costs 1 yuan to open a set of "commercial housing" trunking.

The hydropower master first used "chalk" to mark the position and "direction" of the "wire groove" on the wall, and then the "Lao" he hired used an impact drill to cut out the "wire groove" at the required depth according to the line. trunking".

The hydropower master would rather earn less than 1 yuan, but also try his best to avoid the high risk of "pneumoconiosis" in old age.

Just because the process is relatively complicated, the installation of "hidden thread" is not only a little bit more expensive than the installation of "open thread", it is directly several times more expensive than the labor cost.

"Coach Zhou" and his wife could only hold their noses and admit it.Who told him and his wife to unanimously choose to “hang stones” throughout the house?If you choose "hanging stone", it will be impossible to install "open wire".Could it be possible that those stones could be drilled into the "wire box"?
But "Coach Zhou" doesn't have much regret.After all, the "grain stone" hanging on the wall already felt very "high-end and high-end".

Although his wife feels that the walls are full of "stones", the visual effect is somewhat similar to the first-floor lobby of the local "Maternal and Child Health Care Hospital".But "maternal and child health care hospital" is just "maternal and child health care hospital"... "Coach Zhou" and his wife still look pretty good.

If it doesn’t look good, the “maternal and child health care center” of the imposing tertiary hospital in the local area also chooses this marble “on the wall”.

This proves that their vision is quite good.Only good stone can be so "shared by both refined and popular people".

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like