All-Professional Trainer

Chapter 262 Excavating the Wall Foundation

Chapter 262 Excavating the Wall Foundation

The next day, Ren Yuhui came to the door.

The loan has been approved, with a total amount of one billion yuan, and the land of the 'Quanming Teacher School' is used as collateral.

After signing the loan contract, all the one billion funds were received the next day.

In this way, Li Feng went from billionaire to hundreds of thousands, and then soared from hundreds of thousands to billions.

It's a pity that this billion is all loans.

Using tens of billions of shares of Changshan Group as collateral, the loan reached 30 billion.

The land bought for 30 billion is used as collateral, and the loan reaches [-] billion.

If he couldn't pay back the money, Li Feng would lose a lot of money.

Fortunately, the loan will be repaid starting next year, and it will be paid off in five years.The dividends from Changshan alone are enough for Li Feng to easily repay the loan.Not to mention, Lu Xingsheng and An Lingshan could start paying him dividends next year at most.

On the day the money arrived, Li Feng transferred [-] million to Lu Xingsheng.In addition to the [-] million given at the beginning of the year, Lu Xingsheng's [-] million start-up capital was all given to him.

On An Lingshan's side, although the top-level perfume has not been researched yet, when the top-level perfume is researched, the place where the real money is spent is still expanding sales channels and marketing, and not much money will be spent in a short time.However, Li Feng was too lazy to keep the money in his own hands, and directly transferred all [-] million to her.

In the blink of an eye, a billion becomes a hundred million.

Li Feng felt that he was the real local tyrant, and Yang Chuanjie spent tens of millions a night, so he was so weak.

A few days later, the design institute finally sent a design drawing of the fence.

Li Feng and A Fei did some research and asked the design institute to modify it a few times before finally finalizing the fence.

All the walls are 9000 meters long, including gates, security rooms, and various monitoring and infrared scanning equipment, with a total cost of 5000 million.

Converted down, the average cost per meter reached nearly 8000 yuan.

Only three days later, construction of the wall officially began.

At the end of the month, Li Feng drove to Tashan Town.

Going around, there are more than 30 excavators digging the wall foundation.Each excavator is equipped with a surveyor and an assistant holding an aluminum tower ruler to determine the depth in real time while excavating.

The wall is only three meters high in total, and the foundation below is more than two meters deep.Coupled with the height of the mounds on both sides, the five-meter-long tower was stretched to its longest length, and only a small part was exposed from a distance.

Moreover, if the exterior wall decoration is not counted, the wall is only 24 cm thick in total, and the foundation below has been excavated to a width of almost three meters.

The foundation of a five or six-story building cannot compare to this weightless wall.

Li Feng stopped the car and prepared to stroll around.

Not far away, there was a young man wearing a red helmet with the words "construction worker" printed on it.He was studying construction drawings with a young man wearing a white hard hat with the word "supervisor" written on it.Seeing Li Feng approaching, the construction worker couldn't help but stop him: "Who is there, what's the matter?"

"Come and walk around!" Li Feng replied with a smile.

The construction worker turned to look at Li Feng's car parked aside, and couldn't help but shake his head: "You want to take over the project, right? Don't count on it, the project here is not outsourced."

"No outsourcing?" Li Feng was a little surprised.

The construction worker nodded: "This project is strictly managed, unfamiliar parts are not outsourced, materials are not outsourced, even if it is construction, only familiar construction teams are hired, and they are afraid of cutting corners."

Suddenly, Li Feng couldn't help but praise Yang Chuanjie in his heart.

Layers of outsourcing is a very common thing when doing engineering.Seriously, even a project has changed hands after six or seven steps.

A few points or a dozen or twenty points are drawn on the first floor, and in the hands of the contractor who actually works on the construction site, the total amount has already been reduced by a large amount.Even, it may be lower than the budget after deducting profits and management fees.

If the contractor wants to make money, he naturally has to cut corners.It’s okay to meet a contractor who is not ruthless. The construction drawings designed by the design institute generally have a relatively large safety factor, the concrete grade is lowered, and the reinforcement arrangement is looser. The problem is not too big.

But if you meet a ruthless contractor, no matter how you save money, no matter how much you save money, the tofu project will be born out of nowhere.

If the 'All-Professional Famous Teacher School' can continue to operate, it may become Li Feng's old den for decades.

Li Feng naturally attaches great importance to his future nest.

He smashed 5000 million into just one wall.According to the budget, the cost of building this wall is only about 5000 million.Those [-] million are all profits left to the contractor.

A project of 5000 million yuan can have a profit of 5000 million yuan.Even if it means cutting corners, that's all.

What's more, his old nest project doesn't need the contractor to pay for it.Before construction started, he paid 2000 million in advance. According to the contract, as long as the progress of the project reached the 2000 million in advance, he would pay another 2000 million in advance until the project was completed.

In doing this, if you are still not greedy enough and dare to cut corners on his home project, then don't blame him for being rude.

In the contract, he has already stated that after the completion of the project, Party A will invite a group of professionals from Dongning City to come over with instruments and equipment to check the whole process.If there are cut corners or serious substandard places, if there are few, this section will be demolished and rebuilt.If this is the case for a long paragraph... there is only such an ellipsis on the contract.

Because most of the sections cut corners or were seriously unqualified, if the old nest is tossed like this, Li Feng will not try to reason.

Once Teacher Li got angry, he began to be unreasonable.It is trivial to recover the project funds and let the other party pay for the demolition and reconstruction.

The construction worker's words undoubtedly showed that when Yang Chuanjie helped find a construction company, he also said harsh words in advance.Otherwise, the contractor who built the fence would not dare to outsource even the small foreman who he was not familiar with.

"Okay, let's go if there is nothing else to do!" Seeing that Li Feng had no intention of leaving, the construction worker said impatiently: "There are excavators and mounds everywhere, if something happens, you will be unlucky, and I will also Bad luck has to follow you."

"I'll just go around the periphery and not get close." Li Feng shook his head with a smile. After all, this is his future lair and his biggest fixed asset now.It's rare to come here once, and you have to walk around anyway.

Seeing that Li Feng couldn't be frightened, the construction worker didn't say any more.Now it is just excavating the foundation of the wall, and no materials have entered the site.As long as you don't get close to the excavator, the risk is actually completely negligible.

Li Feng moved forward along the perimeter, watching as he walked.

It didn't stop until it reached the river.

This small river is about [-] meters wide and runs through the entire 'All-Professional Famous Teacher School'.If you look down from a high altitude, you will be able to see that the small river cuts off about one-fifth of the entire school.

According to Li Feng's idea, he will build a small sluice at each end of the small river, and raise more fish in it.On the river, build a few beautiful bridges and pavilions.If the funds are sufficient, go to the bottom of the river to get a few sightseeing tunnels out.

Put some small canopies, small yachts, and build a few places for fishing on the river bank. This will definitely become a good place for students to have leisure and entertainment in the future.

Of course, this is just Li Feng's idea.How to build it depends on the design institute to determine whether the idea is feasible.

After stopping by the small river to watch for a while, Li Feng returned the same way.

In the distance, the dust is flying.

More than a dozen cars roared towards the scene, led by a black Mercedes-Benz, followed by a police car.Behind them, there are all kinds of cars that are common on the road.

 Thanks for the reward from the flowers of the other shore, O(∩_∩)O~...

  
 
(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like