Chapter 77

After turning around a building, many problems were found. The bricks, sand and cement used for construction were piled up on the roof.

The bathroom is also full of waste such as bricks and cement.

According to the agreement, the leftover bricks, cement, and sand should be cleared away in time by those engaged in the main building.

Because the roof and bathroom must be waterproofed.

He called Deng Jianchao to tell the situation, only to hear him say coldly: "Got it!"

Lin Yuan thought: It's okay if you don't know clearly, when my decoration materials will enter the venue, you can't tamper with the materials.

He exchanged 1000 membership points for calls from the bosses of several waterproofing companies and knowledge about waterproofing from the system.

The business value of 10000 was exchanged for the phone calls of several skilled hydropower masters in Nanren City, as well as professional knowledge about hydropower.

The phone number and professional knowledge of the stair handrail welding master were exchanged with the customer approval value of 10000.

He decided to get in touch with these people on the phone first, and then come to see the scene if the conversation is good.

Of course, someone must come over in time.

Waterproof company Ma Wenbiao.

"Mr. Ma, I have eight teaching buildings where the roofs and bathrooms need to be waterproofed. Are you interested in taking it?"

Because it is a school, there is a large bathroom at both ends of each floor.

There are ten large bathrooms on the fifth floor.

After waterproofing is done on the roof, heat insulation should be done.

"Yes, where is your construction site?"

Compared with the number of projects now and after the year, there are fewer projects, so it is easier to find workers.

Besides, the waterproofing companies that Lin Yuan found are all professional waterproofing companies, and the company itself has a professional waterproofing team.

"In Yingcai School, if Mr. Ma is free, come and see the scene, and we will have an interview."

Of course, he needs to sign a construction agreement with them for each type of work.

"Okay, I'll go right there."

Then, Lin Yuan contacted Lan Xinghao, the largest pipe and wire wholesale company in Nanren City.

"Mr. Lan, I have eight teaching buildings here to install water and electricity. Does your company have a professional and skilled construction team? If so, I plan to use your pipes and wires."

"Yes, yes, where is your construction site?"

"School of excellence."

"Which eight teaching buildings of the elementary school of Yingcai School?"

"Yes, it seems that Mr. Lan is still very familiar with this construction site?"

"To tell you the truth, Mr. Deng, the builder, called me over a few days ago, saying that the construction site was going to be renovated, and asked me to quote to him and prepare manpower. Now, you are also talking about this construction site. Are you talking to that Deng? Always together?"

His construction workers are also ready, and even the material budget has been worked out.

But there was no movement from Deng Jianchao.

"Now I have signed the decoration contract with Yingcai School. Mr. Deng is only responsible for the main building. Mr. Lan can send me the quotation and material budget. If the right person is suitable, I can hand over the hydropower project to your company for completion .Or, if you are interested, you can come and talk to me."

"Okay, I'll add you on WeChat and send it to you. I'm still busy here, so I'll go to the construction site to find you in half an hour."

Blue Star added Lin Yuan's WeChat account and sent over the quotation and material budget.

Lin Yuan looked it over and felt that his quotation was quite reasonable.

He exchanged his professional knowledge of water and electricity and knew the brand represented by Blue Star, the cost price, the construction master's labor fee, and the material consumption.

If you have professional knowledge, you will not be easily fooled by others, and you can understand at a glance whether the market price offered by the other party is right, and whether there is a preferential price for a large project.

At this time, Ma Wenbiao from the waterproofing company came to the construction site.

Lin Yuan took him around the whole building.

"Mr. Lin, do we need to clean up the roof and bathroom materials?"

"No, these are the builder's materials, and they are responsible for cleaning up the rest of the materials. If it doesn't work, I'll clean it up as a handyman."

Ma Wenbiao asked Lin Yuan about the material standards stipulated in the contract.

"Asphalt waterproofing membrane is used for the floor, and the thickness should not be less than 3mm. Polyurethane waterproofing material should be used in the toilet filling pit, and secondary waterproofing should be done after backfilling. All materials must use national standards.

After waterproofing, make a layer of 10 cm foam board, then spread a layer of barbed wire, and scrape a layer of 5 cm concrete. "

Lin Yuan told him the standard of decoration requirements signed in the contract.

Ma Wenbiao reported the price of labor and materials to Lin Yuan.

"Every material must have an inspection report and a certificate of conformity, and it must be verified by the school."

"There will definitely be those."

"That horse can always arrange for workers to enter the field."

Ma Wenbiao took out two contracts from the car and signed and stamped them with Lin Yuan on the spot.

Project payments are made monthly based on progress.

Just a few minutes after Ma Wenbiao walked, Blue Star of Hydropower arrived at the construction site.

It turned out that he had already been to the construction site, and this time he came mainly to meet Lin Yuan and sign the contract.

The job site is most afraid of encountering a boss who is smooth-tongued and talks well on the surface. After the project is completed, he uses various reasons to refuse to pay the project payment.

Therefore, people who have been used to engineering for a long time can feel the boss's personality and disposition from the conversation with the boss, so as to decide whether to undertake the project.

Lin Yuan seems to be a real person, without any false praise.

The knowledge of hydropower is also relatively professional.

Blue Star readily signed an agreement with Lin Yuan, promising to bring workers to the site for construction tomorrow.

Lin Yuan received a call from Chen Yu: "Mr. Lin, are you planning to decorate the eight teaching buildings of the Elite School?"

"Just to prepare for decoration, you don't have time to do it. You can help me finish the cement components of the villa with peace of mind."

"It's not me, it's me from a fellow villager. They originally said they were going to Donglin City to build an exterior wall. They found out that the boss took the three-guarantee project. They were afraid that they wouldn't be able to get the project payment. They didn't dare to do it, so they ran back. Nanren City, you called me to ask if I have any projects to do, that's why I asked you." Chen Yu explained.

"The contract has been signed, please ask your fellow villagers to contact me. You need a professional construction master, half a bucket of water is not acceptable."

"Don't worry, they are all masters who have been working for many years."

A few minutes later, Lin Yuan received another call.

"Hi Mr. Lin, I'm Chen Yu, my name is Chen Xiaofei. He said you have external wall projects to do?"

"Yes, how many workers do you have and how much do you pay?"

"Is it an ordinary painting process? There are no special requirements, right? Will the lines be very complicated?"

A series of questions.

Of course, workers must understand the construction requirements.

"It's a school building, one floor is divided into one line. The craftsmanship is based on the standard: putty twice, sanded, one bottom and two sides, the color is not too dark. The requirements are not strict, but the bottom cannot be penetrated, and the wall cannot be scraped too much. Difference."

"How much area does a building have?"

"More than 8000."

"How do you get paid?"

"The completion of the project is acceptable, and it will be settled within a week. During the construction period, each person can pay 50 yuan a day for food."

"16 yuan a square, not expensive, right?"

"Fuck you, I'm in this line of work, I thought I didn't understand the cost of wages, and what's more, the frames are all steel pipe frames, not bamboo frames, which are easy to construct. If you want to do it, it's 15 yuan/square meter. If you don't want to do it, I'll find someone else."

Lin Yuan didn't want to talk too much with him.

"Okay, fifteen is fifteen, when can we start work?"

"tomorrow."

"Do you want to sign a construction contract?"

"It's up to you. If you want to sign, I will sign with you. Also, all the workers who enter the site bring copies of their ID cards, and I will buy insurance for you."

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like