Chapter 1046

Liu Xiaoguang's introduction once again surprised the water friends in the live broadcast room.

"More than 600 kWh? That's too good."

"Brother Guang is amazing. It's the first time to build a hydropower station with such a big hand."

"Brother Guang, how much do you need to invest in a hydropower station of this scale?"

"Brother Guang is awesome, I can't find any other adjectives to brag about Brother Guang."

"Brother Guang, is it too risky to build such a large hydropower station?"

"Brothers, don't worry. The Tailun River Hydropower Station was designed by Chief Engineer Shen Kesheng himself. I still have great confidence in Shen Engineering."

"Chief engineer Shen? Was he the one who designed the largest hydropower station in our country?"

"Brother Guang is amazing, he can actually recruit talents from the National Hydropower Company."

"I feel that this should not be poaching, it may be the National Hydropower Corporation's support for Brother Guang."

"What you said is really possible. Some things are not convenient for the authorities to come forward. It is most appropriate for Brother Guang to come forward."

Liu Xiaoguang did not expect that the water friends would guess the relationship closely. He quickly changed the topic, "The contract signed between Laolonghu Clean Energy Company and Nanyue State is not limited to the Tailun River Hydropower Station. If things go well If so, Laolonghu Clean Energy Company will build three large hydropower stations in Nanyue to ease the power shortage in our country."

Liu Xiaoguang chatted with the water friends, and the off-road vehicle had arrived at the construction site of the Tailun River Hydropower Station.

An aerial view of the River Tyrone from an aircraft.Although the aircraft is far away from the Tyron River, the roar of drinking water can still be heard.

"The river is still very rough. It should be very difficult to build a hydropower plant in such a place, right?"

"This Tai Lun River is the largest river in Nanyue Kingdom, and the water flow is quite impressive. Brother Guang really knows how to choose a place."

"I want to know how the hydropower station was built. It looks very high-end."

Water lovers are very interested in the construction of hydropower stations.

Liu Xiaoguang got off the off-road vehicle, "Brothers, since everyone is so interested in the construction of the hydropower station, let's go to the construction site today."

Following Liu Xiaoguang's camera, water friends saw workers busy laying foundations.

"Brothers, this is the location of the dam of the Tyronn Hydropower Station. According to the plan, we will build a 300-meter-high dam here to block the flow of the Tyronn River. It may be difficult for everyone to imagine such a high dam How much pressure it needs to withstand. To be honest, I can’t imagine, but the pressure is very huge. Here I want to introduce to you that the design of our dam is very clever. If it is an ordinary dam, the thickness requirement is very high. Amazing. This requires a lot of building materials. The thickness of the dam designed by Shen Kesheng is only two-thirds of that of ordinary dams. This can save us a lot of cost." Liu Xiaoguang introduced to the water friends beside the construction site, "Everyone can It can be seen that this dam is built on the sides of the mountains, and when the dam is completed, we will introduce water flow into the reservoir and use the power generated by the drop to generate electricity.”

Liu Xiaoguang simply introduced the power generation principle of the hydropower station to the water friends in the live broadcast room.He can only briefly introduce, and he doesn't understand things that are too detailed, and he may show his timidity if he talks more.

The workers on the construction site of the Tailun River Hydropower Station are all from China. In addition to inspecting the construction of the Tailun River Hydropower Station, Liu Xiaoguang also brought condolences to these workers.

When the workers were resting, Liu Xiaoguang chatted with everyone.

"How's everyone's food here?"

"It's not bad, there's meat and fish in every meal."

"We eat well and live well here, Mr. Liu, don't worry."

Liu Xiaoguang went to check the simple houses where the workers lived, and he did not forget to ask the person in charge of the construction site to ensure that everyone eats and sleeps well.

Soon, it was noon.Liu Xiaoguang did not leave the construction site, but stayed at the construction site for dinner.

"Mr. Liu is eating here, let's add more food for lunch today!"

With that said, the chef at the construction site walked towards the Tailun River not far away.

Liu Xiaoguang became interested and followed, "Master, what are you going to do?"

"Mr. Liu, the pangasius fish from Tailen River is a delicacy of South Vietnam. Let's get some for lunch today."

The chef came to the Tyron River with ease and stretched out his hand to pull a rope.

Soon, a bamboo basket was pulled to the shore.The chef turned the bamboo basket upside down, and a few fresh fish came out of the bamboo basket.

Disappointed, the cook threw the small fish back into the river.

Then, go ahead and pull the other ropes.

Finally, in the third bamboo basket, a large fish with a length of [-] centimeters fell out.

The large fish is slender, with blue-black back and white belly.

With a smile on his face, the chef used a branch to penetrate the gills of the fish and picked up the big fish.

"Mr. Liu, I'll cook boiled fish for you at noon today!"

The chefs moved quickly, and soon, the aroma of food came from the simple kitchen.Regardless of the poor conditions of the kitchen on the construction site, the craftsmanship of several masters is good. In addition, the big pot of rice is already fragrant. The workers who are working can smell the aroma of the food, and their stomachs start to growl.

It's finally time for dinner, three dishes and one soup for lunch.

Braised pork, scrambled eggs with green peppers, braised river prawns and cabbage ball soup.

In addition, Liu Xiaoguang's table has an extra serving of boiled fish.

"Mr. Liu, try this boiled fish. The pangasius from the Tailun River is delicate and has few spines. It is very suitable for boiled fish!"

Liu Xiaoguang was not too polite, he was already hungry after a busy morning.Liu Xiaoguang picked up a piece of fish and ate it with rice. It was spicy and delicious, and tasted really good.

"The craftsmanship of the master is really good!" Liu Xiaoguang gave a thumbs up to the chef not far away.

The other meals are also delicious in color, fragrance, and taste. Although they are not as good as those in high-end restaurants, they are still passable.

Everyone was full of wind and clouds, and they ate very happily.

"Isn't it because I came here that I made it so rich?" Liu Xiaoguang asked the person in charge of the construction site beside him.

"President Liu, don't worry, the price level in Nanyue is not high, and everyone is doing manual work, so our food must be guaranteed."

It may be because of the big pot of rice, Liu Xiaoguang felt that the meal was very delicious.

After lunch, the workers took a lunch break, and Liu Xiaoguang also left the construction site of the hydropower station.

Leaving the construction site, Liu Xiaoguang went to the super factory in Nanyue.

The super factory is also a busy scene. When Liu Xiaoguang came to the factory, a batch of engines happened to be loaded and transported out of the factory.

"Where are these engines going to go?" Liu Xiaoguang asked the staff around him.

"Send it to the Beichen Automobile Factory next door, Mr. Liu, after the Beichen Automobile Factory moves here, our transportation work will be much more convenient."

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like