I can make money by watching videos
Chapter 656 The Revolution of Power Technology
Chapter 656 The Revolution of Power Technology
After listening to the host's words, Director Wang said: "After the five nuclear power plants of Feitian Technology Group have completed the installation, testing and commissioning, we will quickly send an expert team to check various indicators. Approved at the end of April, that is to say, before May 5 at the latest, these five large nuclear power plants of Feitian Technology Group can transmit electricity to the outside world!"
"Regarding when residents, offices, and factories can resume 24-hour power supply, the situation in each region and city is different. In some areas, the lines have been restored, and the power supply can be fully restored before May [-]st. In some areas, the lines have not yet been restored. The smooth flow has been restored, and the equipment has not been repaired, so the time to restore full power supply may be delayed, and we will announce the specific time of restoration of power supply in various places to the public at any time, please pay attention to the information we disclose in time!"
Director Wang continued: "After these five nuclear power plants are put into operation, the total installed capacity of power plants currently in operation in my country will reach 247183 billion kilowatts, of which the five nuclear power plants under the Feitian Technology Group accounted for half! Last year, my country's The total installed capacity of power generation is 228752 billion kilowatts, and the power generation is 75189 billion kwh!"
"Due to the special situation this year, many buildings, railways, highways, highways, factories, etc. in cities and villages in various places have to be rebuilt, and according to scientists' speculation, gray weather will become normal in the next year or even a few years, and industrial and agricultural production needs The power consumption will be about double that of previous years, and the total power consumption in the country will reach 150000 trillion kwh. We will do everything possible to increase power generation to meet the needs of people's life, production and work!"
A foreign reporter asked: "Just now, Director Wang said that your country's annual power consumption will reach about 150000 trillion kWh this year, but last year it was only 75189 billion kWh, which is almost doubled. Can your country achieve this power generation?"
Director Wang smiled and said, "I invite Director Wei to answer this question!"
Director Wei, who was sitting next to Director Wang, took the microphone closer and said: "Before answering this question, I would like to explain to this reporter friend what installed capacity is. Director Wang also said just now that the total installed capacity of our country last year was 228752 billion kilowatts, the power generation is 75189 billion kilowatt-hours, the total installed capacity is the theoretically rated work of the generator sets of all power stations in the country, and it can generate so much power in theory, but in fact the power generation during the day and night is different, because During the daytime, people don’t need lighting and use less electrical appliances; in summer, electricity consumption is larger than in winter, after all, air conditioners, fans and other equipment are used more; It is a long time without work, and the generator set needs regular maintenance!"
"In addition, I just said that the total installed capacity can theoretically generate so much electricity, but the generator has power loss when it is working. For example, the total installed capacity of my hourly power generation is 100 kilowatts, and the power loss is 35 degrees during the power generation process. In fact, the power generation is 65 degrees!"
"In the face of the huge increase in electricity consumption this year, on the one hand, we will try our best to shorten the maintenance time of all generator sets in each power station; With a total installed capacity of 247183 billion kilowatts for the whole year, there is no pressure at all to generate 150000 kWh for the whole year!"
"Moreover, when the climate warms up in April and May, when the rivers thaw, our hydroelectric power station can work again, and the power generation will increase again!"
After Director Wei finished his answer, the host pointed to a reporter from Xiangjiang, who asked, "I am a reporter from Xiangjiang Morning Post. As far as I know, the five new nuclear power plants built by Feitian Technology Group are distributed in the southeast, northwest, middle and middle parts of the country. Five different locations, according to the principle of site selection for nuclear power plants, should be as far away as possible from densely populated and economically developed areas, and most of them are distributed in coastal areas. Why did your group build these five nuclear power plants in five different locations? Don’t you think Is there energy loss in long-distance transmission of electricity? Don’t you need to consider the high maintenance costs of long-distance transmission lines and equipment?”
The host said: "Please ask Mr. Huang Yiming, general manager of the power equipment manufacturing company, a subsidiary of the group, to answer this question!"
Huang Yiming thought it was finally my turn, and he said: "Because our nuclear power plant does not use the traditional third-generation nuclear reactor technology, but the new-generation nuclear energy system technology, so there is no need to consider the issue of nuclear reactor cooling. Build nuclear power plants along the coast!"
"We built these five nuclear power plants in five different directions originally to provide power for the charging stations of our group's new energy manufacturing company. The annual total installed capacity of nuclear power plants can transmit electricity to all regions of the country and solve the problem of insufficient electricity in the country. In order to solve the problems of excessive loss of long-distance transmission lines and the high cost of erecting long-distance transmission lines and maintenance, our group will use remote wireless Power transmission technology, in this regard, we will carry out all-round cooperation with the power department to solve the problem of long-distance wireless power transmission, and provide power to users in time!"
As soon as the term long-range wireless power transmission technology came out, it immediately attracted the attention of all the reporters present.
Immediately, a reporter asked: "Mr. Huang, is the long-range wireless power transmission technology you mentioned just like emitting electromagnetic waves?"
Huang Yiming nodded and said: "Almost, but wireless electromagnetic waves spread over a wide range, and our wireless power transmission technology uses fixed-point transmission and fixed-point reception. The energy loss during transmission is much smaller than that of long-distance transmission lines. There is no long-distance transmission line erection and For maintenance issues, only the equipment at the transmitter and receiver needs to be maintained!"
The term wireless power transmission technology is not too new. Scientists have proposed this technical idea for more than 100 years, but it has not been developed. Now Feitian Technology Group has actually researched this technology, and it will be used in real life. In view of Feitian The science and technology group will use this technology to solve the problem of national electricity transmission. The reporters think that this technology must be mature, which is big news.
If this technology is used on a large scale around the world, it will benefit all mankind, because there is no need to lay long-distance transmission lines, which can save a lot of costs, ignoring geographical and environmental constraints, as long as the technology is achieved, electricity can be transmitted to the ocean. On the other hand, electricity can be transmitted from the east to remote, impoverished and backward Africa, and even to any corner of the earth.
This is an epoch-making power technology revolution!
Immediately, a reporter realized the possible impact of this technology on human beings all over the world. The reporter immediately asked: "Mr. Huang, has this long-distance wireless power transmission technology of your group been able to be freely transmitted across the country? Then Can it be freely transmitted around the world? Is it possible to transmit your country’s excess power generation to remote and backward Africa?”
Huang Yiming said with a smile: "At present, our technology can transmit electricity to any corner in China. As for the long-distance technology across oceans and continents, our scientists are working hard to overcome it. I believe it will be possible in the near future." accomplish!"
"Mr. Huang, regarding the supporting transmission and receiving equipment required for long-range wireless power transmission technology, is your company producing? What is the production capacity? When will it be able to meet the national demand?"
Huang Yiming said: "Yes, this set of equipment is divided into three types: large, medium and small. Our production capacity is determined according to market demand. If the market demand is large, we will build additional production lines. As for when we can meet the national demand, I think Director Wang should answer this question!"
"Okay!" Director Wang agreed, and said into the microphone: "We will cooperate with the power equipment manufacturing company under the Feitian Group to purchase a large number of various types of wireless power transmission and reception equipment, and complete all of them within a month. Installation of wireless power receiving and transmission equipment for provincial power companies; complete the installation of wireless power receiving and transmission equipment for provincial power companies and municipal power companies within one month, and for provincial and regional power companies within one month Install the power transmission and receiving equipment with the subordinate county-level power companies, and install the equipment in towns and rural areas in one month! In order to save costs, we use the short-distance transmission lines that were previously available, and we use them if we can’t. After dismantling, it will be changed to wireless transmission and reception, and the old wired power transmission lines and equipment will be eliminated year by year in the future!"
In the office above the [-]th floor where the press conference was held, several people were filming and watching through the live broadcast. Tang Xiaochuan said with a smile: "Mr. He and the others are still very photogenic!"
Liu Zhiyuan said: "Mr. He has been an old administrator for decades, and he has experienced many such scenes!"
Tang Xiaochuan asked: "Mr. Liu, I asked you to choose an engineer to go on a business trip to the moon. How is the matter going?"
"The final selection is in progress. After all, we are going to the moon. Once we go, we can come back if we don't want to. Those who are selected must endure loneliness, have a sense of responsibility, have strong self-discipline, and be serious and responsible for their work. , technically superior!"
Tang Xiaochuan nodded: "When will the selection be completed?"
"The final candidate can be determined within three days. Once the candidate is determined, we must concentrate on training and learning! In addition, the construction materials transported to the moon are almost ready, and they will all be in place in the next two days. When will the spacecraft Go?" Liu Zhiyuan asked.
Tang Xiaochuan said: "The materials are almost ready, so let's make sure to set off the day after tomorrow!"
(End of this chapter)
After listening to the host's words, Director Wang said: "After the five nuclear power plants of Feitian Technology Group have completed the installation, testing and commissioning, we will quickly send an expert team to check various indicators. Approved at the end of April, that is to say, before May 5 at the latest, these five large nuclear power plants of Feitian Technology Group can transmit electricity to the outside world!"
"Regarding when residents, offices, and factories can resume 24-hour power supply, the situation in each region and city is different. In some areas, the lines have been restored, and the power supply can be fully restored before May [-]st. In some areas, the lines have not yet been restored. The smooth flow has been restored, and the equipment has not been repaired, so the time to restore full power supply may be delayed, and we will announce the specific time of restoration of power supply in various places to the public at any time, please pay attention to the information we disclose in time!"
Director Wang continued: "After these five nuclear power plants are put into operation, the total installed capacity of power plants currently in operation in my country will reach 247183 billion kilowatts, of which the five nuclear power plants under the Feitian Technology Group accounted for half! Last year, my country's The total installed capacity of power generation is 228752 billion kilowatts, and the power generation is 75189 billion kwh!"
"Due to the special situation this year, many buildings, railways, highways, highways, factories, etc. in cities and villages in various places have to be rebuilt, and according to scientists' speculation, gray weather will become normal in the next year or even a few years, and industrial and agricultural production needs The power consumption will be about double that of previous years, and the total power consumption in the country will reach 150000 trillion kwh. We will do everything possible to increase power generation to meet the needs of people's life, production and work!"
A foreign reporter asked: "Just now, Director Wang said that your country's annual power consumption will reach about 150000 trillion kWh this year, but last year it was only 75189 billion kWh, which is almost doubled. Can your country achieve this power generation?"
Director Wang smiled and said, "I invite Director Wei to answer this question!"
Director Wei, who was sitting next to Director Wang, took the microphone closer and said: "Before answering this question, I would like to explain to this reporter friend what installed capacity is. Director Wang also said just now that the total installed capacity of our country last year was 228752 billion kilowatts, the power generation is 75189 billion kilowatt-hours, the total installed capacity is the theoretically rated work of the generator sets of all power stations in the country, and it can generate so much power in theory, but in fact the power generation during the day and night is different, because During the daytime, people don’t need lighting and use less electrical appliances; in summer, electricity consumption is larger than in winter, after all, air conditioners, fans and other equipment are used more; It is a long time without work, and the generator set needs regular maintenance!"
"In addition, I just said that the total installed capacity can theoretically generate so much electricity, but the generator has power loss when it is working. For example, the total installed capacity of my hourly power generation is 100 kilowatts, and the power loss is 35 degrees during the power generation process. In fact, the power generation is 65 degrees!"
"In the face of the huge increase in electricity consumption this year, on the one hand, we will try our best to shorten the maintenance time of all generator sets in each power station; With a total installed capacity of 247183 billion kilowatts for the whole year, there is no pressure at all to generate 150000 kWh for the whole year!"
"Moreover, when the climate warms up in April and May, when the rivers thaw, our hydroelectric power station can work again, and the power generation will increase again!"
After Director Wei finished his answer, the host pointed to a reporter from Xiangjiang, who asked, "I am a reporter from Xiangjiang Morning Post. As far as I know, the five new nuclear power plants built by Feitian Technology Group are distributed in the southeast, northwest, middle and middle parts of the country. Five different locations, according to the principle of site selection for nuclear power plants, should be as far away as possible from densely populated and economically developed areas, and most of them are distributed in coastal areas. Why did your group build these five nuclear power plants in five different locations? Don’t you think Is there energy loss in long-distance transmission of electricity? Don’t you need to consider the high maintenance costs of long-distance transmission lines and equipment?”
The host said: "Please ask Mr. Huang Yiming, general manager of the power equipment manufacturing company, a subsidiary of the group, to answer this question!"
Huang Yiming thought it was finally my turn, and he said: "Because our nuclear power plant does not use the traditional third-generation nuclear reactor technology, but the new-generation nuclear energy system technology, so there is no need to consider the issue of nuclear reactor cooling. Build nuclear power plants along the coast!"
"We built these five nuclear power plants in five different directions originally to provide power for the charging stations of our group's new energy manufacturing company. The annual total installed capacity of nuclear power plants can transmit electricity to all regions of the country and solve the problem of insufficient electricity in the country. In order to solve the problems of excessive loss of long-distance transmission lines and the high cost of erecting long-distance transmission lines and maintenance, our group will use remote wireless Power transmission technology, in this regard, we will carry out all-round cooperation with the power department to solve the problem of long-distance wireless power transmission, and provide power to users in time!"
As soon as the term long-range wireless power transmission technology came out, it immediately attracted the attention of all the reporters present.
Immediately, a reporter asked: "Mr. Huang, is the long-range wireless power transmission technology you mentioned just like emitting electromagnetic waves?"
Huang Yiming nodded and said: "Almost, but wireless electromagnetic waves spread over a wide range, and our wireless power transmission technology uses fixed-point transmission and fixed-point reception. The energy loss during transmission is much smaller than that of long-distance transmission lines. There is no long-distance transmission line erection and For maintenance issues, only the equipment at the transmitter and receiver needs to be maintained!"
The term wireless power transmission technology is not too new. Scientists have proposed this technical idea for more than 100 years, but it has not been developed. Now Feitian Technology Group has actually researched this technology, and it will be used in real life. In view of Feitian The science and technology group will use this technology to solve the problem of national electricity transmission. The reporters think that this technology must be mature, which is big news.
If this technology is used on a large scale around the world, it will benefit all mankind, because there is no need to lay long-distance transmission lines, which can save a lot of costs, ignoring geographical and environmental constraints, as long as the technology is achieved, electricity can be transmitted to the ocean. On the other hand, electricity can be transmitted from the east to remote, impoverished and backward Africa, and even to any corner of the earth.
This is an epoch-making power technology revolution!
Immediately, a reporter realized the possible impact of this technology on human beings all over the world. The reporter immediately asked: "Mr. Huang, has this long-distance wireless power transmission technology of your group been able to be freely transmitted across the country? Then Can it be freely transmitted around the world? Is it possible to transmit your country’s excess power generation to remote and backward Africa?”
Huang Yiming said with a smile: "At present, our technology can transmit electricity to any corner in China. As for the long-distance technology across oceans and continents, our scientists are working hard to overcome it. I believe it will be possible in the near future." accomplish!"
"Mr. Huang, regarding the supporting transmission and receiving equipment required for long-range wireless power transmission technology, is your company producing? What is the production capacity? When will it be able to meet the national demand?"
Huang Yiming said: "Yes, this set of equipment is divided into three types: large, medium and small. Our production capacity is determined according to market demand. If the market demand is large, we will build additional production lines. As for when we can meet the national demand, I think Director Wang should answer this question!"
"Okay!" Director Wang agreed, and said into the microphone: "We will cooperate with the power equipment manufacturing company under the Feitian Group to purchase a large number of various types of wireless power transmission and reception equipment, and complete all of them within a month. Installation of wireless power receiving and transmission equipment for provincial power companies; complete the installation of wireless power receiving and transmission equipment for provincial power companies and municipal power companies within one month, and for provincial and regional power companies within one month Install the power transmission and receiving equipment with the subordinate county-level power companies, and install the equipment in towns and rural areas in one month! In order to save costs, we use the short-distance transmission lines that were previously available, and we use them if we can’t. After dismantling, it will be changed to wireless transmission and reception, and the old wired power transmission lines and equipment will be eliminated year by year in the future!"
In the office above the [-]th floor where the press conference was held, several people were filming and watching through the live broadcast. Tang Xiaochuan said with a smile: "Mr. He and the others are still very photogenic!"
Liu Zhiyuan said: "Mr. He has been an old administrator for decades, and he has experienced many such scenes!"
Tang Xiaochuan asked: "Mr. Liu, I asked you to choose an engineer to go on a business trip to the moon. How is the matter going?"
"The final selection is in progress. After all, we are going to the moon. Once we go, we can come back if we don't want to. Those who are selected must endure loneliness, have a sense of responsibility, have strong self-discipline, and be serious and responsible for their work. , technically superior!"
Tang Xiaochuan nodded: "When will the selection be completed?"
"The final candidate can be determined within three days. Once the candidate is determined, we must concentrate on training and learning! In addition, the construction materials transported to the moon are almost ready, and they will all be in place in the next two days. When will the spacecraft Go?" Liu Zhiyuan asked.
Tang Xiaochuan said: "The materials are almost ready, so let's make sure to set off the day after tomorrow!"
(End of this chapter)
You'll Also Like
-
Shinobi: I'm Really a Supportive Ninja
Chapter 380 2 hours ago -
Hokage Arena, I am Ye Yun, Uchiha!
Chapter 152 2 hours ago -
Naruto: Six Paths of the Senju Family
Chapter 279 2 hours ago -
The Muscle God of the Uchiha
Chapter 435 2 hours ago -
Naruto: Blacked-out Uzumaki Naruto is Super Handsome
Chapter 165 2 hours ago -
The Magical Journey to Hogwarts
Chapter 954 2 hours ago -
I was rejected when I wrote a song, but I became a king on my debut
Chapter 240 2 hours ago -
Infinite Terror of Others
Chapter 129 2 hours ago -
My Skills Have Special Effects
Chapter 473 2 hours ago -
Immortality, Starting from the Side Sect
Chapter 179 2 hours ago