Xueba's technology tree

Chapter 356 Wireless Power Transmission Network

Chapter 356 Wireless Power Transmission Network
On November 2027, 11, at the Xinghuo Technology Headquarters in Xiongan New Area.

Zhou Yu, chairman of Spark Technology, and Hu Xianguo, chairman of State Grid, formally signed a cooperation agreement.

Xinghuo Technology authorizes State Grid to use gravitational wave energy-carrying technology and helps State Grid build a wireless power transmission network.

According to the arrangement of relevant state departments, Huaxia will gradually complete the power grid transformation work.Use wireless power transmission technology instead of wired power transmission technology.

After signing the agreement, Hu Xianguo shook hands with Zhou Yu, and he said excitedly: "Chairman Zhou, we have a happy cooperation.

From the superconducting cable project, we cooperated with Xinghuo Technology. I really did not expect that Xinghuo Technology has developed more advanced technologies, and now you can build wireless power transmission networks.

The wireless power transmission network is too advanced, the same gravitational wave energy-carrying equipment.It can actually transmit electric energy with different voltages and currents to users according to different user terminals. "

Zhou Yu said with a smile: "Technology is always improving. Without the support of the state and power grid groups, we don't know how long it will take for the wireless power transmission network to be rolled out."

After Xinghuo Technology and State Grid signed the agreement, they began to arrange gravitational wave energy-carrying equipment based on the calculated nodes of the quantum computer.

Xinghuo Technology is divided into two units of software and hardware, and cooperates with the State Grid to complete the construction of the wireless power transmission network.

The core of the software equipment is the quantum computer server, and the power distribution center formed by the software department to help the State Grid is located at the State Grid headquarters.

The wireless power transmission network composed of gravitational wave energy-carrying equipment makes it easier to regulate power.

But Huaxia is a huge country with a large population and complicated electricity consumption.

Even if the gravitational wave energy-carrying equipment is very easy to operate, it still needs a very stable software system to control it.

The most important thing for State Grid is stability. Some software performance can be sacrificed, but the entire system must be stable.

The hardware part is mainly to install gravitational wave energy-carrying equipment all over the country.

The engineering team sent by Xinghuo Technology, they drove the engineering mecha, and began to deploy gravitational wave energy-carrying equipment all over the country.

Through the arrangement of gravitational wave energy-carrying equipment, it can also verify whether the engineering mecha is reliable.

Huaxia covers a vast area, ranging from forests to deserts, from the world's highest plateau to plains, and has all kinds of terrain.

In the center of Yanjing, the gravitational wave energy-carrying equipment deployment team is building a tall tower with engineering mechs.It will be a new landmark building in Yanjing.

This tall tower is used to carry gravitational wave energy carrying equipment.

In fact, gravitational wave energy-carrying equipment can use anti-gravity technology to make it float in the air about 100 meters above the ground.

Try to make it cover as many areas as possible and provide power to more users.

However, the method of using anti-gravity technology, after the demonstration of scientists, found that this method has certain hidden dangers.

That is, its fault tolerance rate is too low, as long as there is a problem with the anti-gravity equipment, or there is a short-term problem with the wireless power transmission network.

It will directly cause gravitational wave energy-carrying equipment to fall from the sky like dumplings.

Using tall towers to carry gravitational wave energy-carrying equipment does not cause this problem.

Particle batteries can be installed on the tower to ensure that the gravitational wave energy-carrying equipment is always on standby.

Even if there is a problem with the particle battery, there are still fuel generators arranged on the tower.

At the Tanggula Pass, Xinghuo Technology employees are driving engineering mechs and are arranging gravitational wave energy-carrying equipment on a low tower.

On the shore of Xingkai Lake, employees of Xinghuo Technology are driving engineering mechs to drive piles and erect towers on the frozen soil.

In the hot spring sea city in the East China Sea, employees of Xinghuo Technology are driving engineering mechs, and are reinforcing the water city with chains.

Let this floating city stop floating arbitrarily, and fix it directly at this position.

Because this water city installs tall towers of gravitational wave energy-carrying equipment to provide sufficient energy for equipment operating in the offshore.

On the unnamed island and reef in the South China Sea, employees of Xinghuo Technology drove engineering mechs to build a new lighthouse and a high-speed rail with gravitational wave energy-carrying equipment on the unnamed island and reef.

While Xinghuo Technology is deploying gravitational wave energy-carrying equipment.

The employees of the State Grid Corporation also started to take action. They contacted the electrical appliance manufacturers and installed the wireless power transmission network receiving end directly inside the electrical appliances.

At the same time, they also began to enter the household, distributing plug-in strips with wireless power transmission network receiving terminals to the public free of charge.

This kind of plug-in strip is to ensure that the electrical appliances produced before can still use the wireless power transmission network.

Users can bind the receiving end of the wireless power transmission network through their own smart devices, and can also delete the receiving end of the wireless power transmission network.

Users can also manually pause the receiving end of a wireless transmission network.

Consumers can artificially control which appliances use electricity.

The electricity bill is deducted in real time, and as long as there is no money in the account, the connection between the device and the wireless power transmission network will be cut off immediately.

Through smart devices, consumers can also set the upper limit of electrical energy used by electrical appliances every day.

Hu Xianguo stared at the control center of the wireless transmission network.

He could see the gravitational wave energy-carrying equipment installed and officially activated.

Gravitational wave energy-carrying equipment is spread all over the world, even in deserts, grasslands, and glaciers.

This is Huaxia's huge infrastructure, even if the electricity demand in these places is very small.

But their national grid is a state-owned enterprise, and they must also deploy wireless power transmission networks in these places.

Especially for large cities and key areas where power consumption is concentrated.

More than one gravitational wave energy-carrying device is arranged to form a wireless power transmission network to prevent local power outages due to accidental damage to the gravitational wave energy-carrying device.

The secretary reported to Hu Xianguohui: "Chairman, Xinghuo Technology has completed the arrangement of gravitational wave energy-carrying equipment across the country.

We have also coordinated with power plants to officially launch the wireless power transmission network.

Large-scale factories and residents in major cities across the country have completed the transformation of the receiving end of the wireless power transmission network.

When we start the wireless power transmission network, we will not abandon the current superconducting cable power transmission network.

Until the wireless power transmission network completely replaces the wired transmission, we will abandon the wired transmission method. "

Hu Xianguo couldn't hide his excitement, and immediately ordered: "Then turn on the wireless power transmission network now."

The controllable nuclear fusion power station in Henan Province, they received the notification from the State Grid, and immediately began to switch the transmission channel of electric energy.

Let part of the electric energy of the controllable nuclear fusion power station start to be distributed through the wireless power transmission network.

The huge electric energy generated by the controllable nuclear fusion power station began to be transmitted to the whole country through the gravitational wave energy-carrying equipment.

Hu Xianguo stared at the transmission network switching situation of the controllable nuclear fusion power station.

Everything is working fine without any electrical incidents.

This is because the controllable nuclear fusion power station and the national grid cooperate with each other, and the electric energy transmitted to the wireless power transmission network has always been within the controllable range.

Hu Xianguo saw that a small number of factories and residents have begun to officially use the wireless power transmission network.

He believes that with the superiority of the wireless power transmission network, it will soon be able to replace the status of the superconducting cable power transmission network.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like