Urban black technology supplier

Chapter 75, send you rich

Chapter 75, send you rich
A chance to make a fortune?
Now Niushizhang's eyes suddenly became as sharp as Tumei's.

In terms of getting rich, Li Yun has already given him the opportunity to rent out his factory space. Even the rent is enough for him to live a good life in Tianhai City, let alone sell livestock. , so that his current income is close to that of a well-off family in the urban area.

A well-off family in Tianhai City can be regarded as a wealthy family in a second- and third-tier city.

But now, Li Yun wants to give him another chance to make a fortune?

To be honest, Bullshit Zhang really didn't know what else he could do to help Li Yun.

If slaughtering livestock counts.
Could it be to do engineering?

This makes Niu Shizhang even more confused. You must know that although his previous brothers are skilled, they are all unlicensed and unlicensed personnel. With Li Yun's current status, he wants to hire someone who has both skills and certificates. A complete engineering team should not be too simple.

But to Niushizhang's surprise, Li Yun really wanted him to do a big project!

"I don't want to be sloppy with you. This project has a project volume of tens of millions. You have to think about whether to do it or not." Li Yun said with a slight smile.

Fuck!Tens of millions of projects!
The glass of Lao Baigan held in this bullshit Zhang's hand suddenly trembled. Thanks to him finally calming down, the glass of fine wine was not wasted on the floor.

You are playing with my bullshit Zhang!
"Little Li, I didn't say that, my engineering team can't take over the tens of millions." Niu Shizhang immediately refused: "Although we have excellent technology, if you don't have a certificate to build, you will definitely not be able to pass the relevant inspection. The approval of the department, we can't cheat you."

Yes, Niu Shizhang was afraid that Li Yun would be tricked. Once this unlicensed and unlicensed construction team was targeted by the relevant departments, it would definitely be the rhythm of a shutdown.

Not to mention a tens of millions of projects, once something goes wrong, he can't bear the responsibility.

Seeing the bullshit Zhang's stern refusal, Li Yun sighed with emotion, then shook his head.

"Don't worry, Mr. Zhang. Although this project is tens of millions, it has absolutely nothing to do with safety, and the relevant departments will not come to inspect these things." Li Yun said with a look of reassurance on Niushizhang: " It's even less dangerous than installing a water heater, and you can do it with basic experience."

After saying that, Li Yun looked at Niushi Zhang with a serious face and said.

"What you need to tell me now is how many people your engineering team can produce. My project is not generally large, and it may be needed in the future."

Seeing Li Yun's determined face, Niu Shizhang no longer hesitated. If he evaded this again, he would not be a man.

"I can get together a group of 1 people at most, and these are the people who worked with me back then." The cow dung Zhang said with a bitter smile: "When the new policy came out, some of them went home to plant large fields. , some are working in nearby factories, and some are working in the factory of your technology star."

The implication of Niu Shizhang is that these people have already changed careers, and the technology in their hands does not know how much is left. If they are allowed to do it, I am afraid.
However, Li Yun interrupted the bullshit Zhang hesitant to speak, and said with a smile.

"What I need is a trustworthy engineering team, and the quality of the technology is second."

"The most important thing is that they understand the installation procedures of engineering equipment and are trustworthy."

Yes, it is trustworthy!

It’s not that people from other engineering teams can’t do it, but this time it’s not a one-shot deal. In the future, there will definitely be other engineering projects besides the large-scale vegetation greenhouse cultivation system, so it is necessary to raise an engineering team by yourself .

And right now, Bullshit Zhang is a good candidate.

The two have known each other for many years, and they also know Li Yun very well about Niu Shizhang. Although this guy likes to be greedy for petty gains and is a bit of a petty bourgeois, he is very kind in his heart, which can be seen from the time he persuaded Li Yun not to open the factory.

At the same time, he is very willing to endure hardships and stand hard work, otherwise he would not have become the chief dog owner in Ergou Hutong before.

Even now, the factory is rented out and he has earned a lot of money. As always, he gets up early and returns late to kill poultry, sweep manure and deliver meat.

For Niu Shizhang, Li Yun was quite at ease.

"Well, if it's a big project worth tens of millions, I'm sure my brothers won't have trouble with the money." Niushizhang said the truth, he was very moved.

Generally speaking, if you say this for a large project of tens of thousands of tens of thousands, as a subcontractor, I am afraid that you can get a 15% profit and you will be able to laugh. This is their hard-earned money.

But Li Yun's implication is that the project was directly contracted to him, and there is no such thing as a family and a house, and there is no need to pack the materials by himself.

Generally speaking, according to the previous experience of Niu Shizhang, if the materials are not produced, their engineering team can earn at least 1000-300 million for a 400 million project!
For ordinary engineering teams, this is already a very superior treatment, not to mention that Li Yun said that there must be more than just this single project.
Bullshit Zhang has no reason to refuse!

Seeing Niu Shizhang finally made up his mind, Li Yun didn't hesitate, and said to Niu Shizhang directly: "Wait, I'll give you a rough drawing."

"OK."

The large-scale vegetation greenhouse cultivation device is different from ordinary greenhouse equipment. Its complete form is to lay pieces of transmission plates under the soil, and detect the condition of plants through metal gussets one by one.

No need for a greenhouse!No roof required!
This is the biggest feature of this cultivation device. The most basic requirement of a general constant temperature roof is a roof that blocks sunlight, but this large-scale vegetation cultivation device does not need it!
All he needed was fertile soil and plenty of water, which were nothing to the highly modernized Tianhai City.

"Start modeling."

Li Yun closed his eyes, the brain capacity of E+ level allowed him to project a complete set of equipment in his mind, from the structure of parts to welding and assembly, and then to the complete graphics.

While projecting modeling in the mind, the right hand is also sliding the mouse on the computer to start drawing drawings.

Soon, the prototype and general structure of this large-scale vegetation cultivation device slowly appeared in the computer drawing software.

Two 10 minutes later.

Drawing done!

 Thank you for your hard work buddy

  
 
(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like