God-level Miner
Chapter 349 Website Video
Chapter 349 Website Video
There are three people in front of them, all wearing work clothes and hard hats, one of them is holding a construction design drawing in his hand, talking about something, and the two next to him nod their heads from time to time, or say something.
Those who are familiar with it will know that these three people are the project directors of this special railway line with a length of more than ten kilometers. The three people are discussing and exchanging some construction problems.
Generally speaking, the project is progressing smoothly. The roadbed has been formed in many places. There are a lot of construction machinery and a large number of workers busy on the entire railway line. A large amount of stone, cement, sand, steel bars, etc. can be seen everywhere.
Seeing these three people, Zhou Guoqiang's eyes lit up, and he immediately quickened his pace and walked towards the location of the three people. Zhou Guoqiang's assistant quickly followed.
Seeing Zhou Guoqiang walking towards him, the three of them immediately stopped communicating, and one of them said loudly: "Mr. Zhou, why did you come here in person? Do you have anything to do with us?"
Of course there is something!
Zhou Guoqiang nodded, without hiding anything, and said straight to the point: "You three, it's rare that you all happen to be together, so I'll save myself from going to inform you."
Seeing that there seemed to be something important, the three looked focused and listened attentively.Zhou Guoqiang is the general manager of the Huangtang mining area, and is the party A of the construction project of this railway line. The three of them must listen to Zhou Guoqiang in everything. It can be seen from the expressions of the three of them that they respect Zhou Guoqiang very much.
One of them, wearing gold-rimmed glasses, is the chief technical officer of this special railway line. His surname is Liu, and everyone generally calls him Chief Engineer Liu. "
Zhou Guoqiang pointed to the railway under construction in front of him: "Three, can the construction progress of this section of railway be made faster? I hope it will be completed two months earlier than the planned completion date."
Two months in advance!
The three of them were slightly startled, and really couldn't figure out why. You know, in the eyes of the three of them, the construction of this section of the railway was already progressing fast enough, yet Zhou Guoqiang actually wanted to speed it up.
Zhou Guoqiang can't wait!
In the past few days, I have been focusing on the construction of the railway, and I also take time to walk around the railway line every day, take a look, and understand the progress of the project.
So much attention is mainly due to the fact that the news of the Douliashan mining area has continuously spread to Zhou Guoqiang’s ears. Since the two combined mining vehicles, the daily output of iron ore in the Douliashan mining area has skyrocketed, 8000 on the first day More than 1000 tons, more than [-] tons on the second day, and more than [-] tons on the third day...
Yesterday, the news reached Zhou Guoqiang's ears again. The daily output of the Douliashan mining area unexpectedly reached more than [-] tons!
Zhou Guoqiang knew that the rapid increase in production capacity was mainly because of the two combined mining vehicles. If there were such two combined mining vehicles in the Huangtang mining area, Zhou Guoqiang would also have full confidence and confidence that he would be able to achieve such an output.
Zhou Guoqiang originally wanted to have a few combined mining vehicles. After seeing the daily output of the Douliashan mining area soared, he was so envious of the combined mining vehicles. He often thought in his heart, let alone a few vehicles, even one ah.
However, the boss said that the railway in the Huangtang mining area has not been built yet. If too much iron ore is mined, it will not be possible to transport so much iron ore by the current road transportation alone.
If you want to have a combined mining vehicle, the most urgent task is to build the railway. After the railway is completed, there will be a combined mining vehicle. This is what Wang Xudong personally said.
As a result, Zhou Guoqiang felt compelled to build the railway today.That's why Zhou Guoqiang approached the three project leaders and asked to speed up the project, hoping to complete it about two months ahead of the original plan.
Mr. Liu said with a distressed face: "Mr. Zhou, the project schedule is so tight. It is a bit difficult to complete the project two months ahead of schedule."
Zhou Guoqiang pointed to the mining area not far away, and said slowly: "You should also know that our mining area is developing rapidly, and a large amount of iron ore needs to be transported out. This railway is needed. It was built one day earlier, and a large amount of iron ore It can be shipped to major steel companies across the country one day earlier, and we can generate huge economic benefits one day earlier."
"Hmm." The three nodded in unison.
This point is relatively easy to understand. After staying here for such a period of time, the three of them also have a better understanding of the Huangtang mining area. They know that this place is full of high-quality iron ore, and the output is also amazing. They really need railways urgently.
One of them nodded and said firmly, "Mr. Zhou, if this is the case, then we will open night shifts and work day and night to speed up the progress of the project."
Day and night, it must be much faster.
Zhou Guoqiang agreed: "Then everyone has worked hard. When the railway is completed, I will apply for it and give you a part of the reward, which is regarded as compensation."
There is still money, and the three of them are also happy.
Then, Zhou Guoqiang explained some things, such as paying attention to safety, ensuring the quality of the project, etc. After explaining these, Zhou Guoqiang's mood suddenly improved unprecedentedly, thinking in his heart, when this railway is completed, I will go to the boss, Huangtang mining area A couple of those combined mining vehicles, too.
Thinking of the combined mining vehicle, Zhou Guoqiang began to look forward to it. In his mind, there seemed to be a huge grand blueprint slowly unfolding. His heart was filled with energy in an instant, and he walked towards the mining area with strong strides.
.........
Wang Xudong also has a grand blueprint in his mind.
In the Doulia Mountain mining area, in the office, Wang Xudong is discussing the construction of the Doulia Mountain mining area with Qin Tian. Now, Qin Tian can be said to be Wang Xudong's royal planning expert. The Doulia Mountain mining area was originally planned by Qin Tian. The mine was also planned by Qin Tian.
There are now two combined mining vehicles in the Douliashan mining area, and there will be a third, fourth, fifth and so on in the future. As the combined mining vehicles are put into use one by one in the future, the entire mining area will definitely happen again Earth-shaking changes.
In this way, it is necessary to re-plan, which is called re-planning. Strictly speaking, it should be an upgrade and expansion on the existing basis.
Standing in front of the big window of the office, Wang Xudong looked down from a high position with a wide view, pointing to the front and said, "Soon after, the entire crushing area will be demolished and become a finished iron ore storage yard, and the four-lane heavy-duty cement road that enters the mining area will be expanded. There are eight lanes, the roads in the mining area are fully widened, and the loading capacity of iron ore is increased..."
Behind Wang Xudong, Qin Tian listened carefully, keeping some of Wang Xudong's thoughts and requirements in mind. The upgrade and expansion of the mining area this time was basically in accordance with Wang Xudong's requirements, coupled with his Qin Tian's professional knowledge.
Qin Tian's posture is very low, and he keeps nodding. If there are familiar people here, seeing Qin Tian's appearance, they will definitely be surprised and exclaim, this is a proud expert Qin, it's impossible!
Just now, Qin Tian went to the mining area to have a look. Qin Tian is naturally very familiar with the entire mining area, because this was planned by Qin Tian. At the beginning, according to Wang Xudong's request, it was planned to produce [-] tons of iron ore per day. Reserve space for upgrades and extensions.
At the time of planning, Qin Tian couldn't believe it to death. The daily output here could reach [-] tons. Later, with the increase of the output of the mining area, Qin Tian gradually believed it.
After looking around just now, I was deeply shocked. The output of the entire mining area has reached more than [-] tons. I'm afraid it's not far away.
My God, it can really reach [-] tons!
In this way, Qin Tian didn't have any arrogance, he acted honestly, and admired Wang Xudong even more in his heart.
At the beginning, it was just a very small mine. It is a miracle that it has reached such an astonishing scale in less than a year.
And for this miracle to happen, he, Qin Tian, also has a share of the credit, because the planning of the entire mining area was made by him. Practice has shown that Qin Tian's planning is very scientific and reasonable, so Qin Tian felt a little excited, Even a little proud.
After listening to Wang Xudong's speech, Qin Tian nodded and said, "Mr. Wang, I will quickly complete the next stage of planning and complete the upgrade and expansion of the Doulia Mountain mining area as soon as possible."
"En." Wang Xudong nodded and said: "Take time to hurry up. You have also seen the two combined mining vehicles and know their mining efficiency. In less than a month, three more combined mining vehicles will be put into the Doulia Mountain mining area."
There are three more!
These two cars are already remarkable, and three more cars will make a total of five cars. Wouldn't it be easy to reach the scale of 10,000+ tons of iron ore per day?
Qin Tian said excitedly: "President Wang, there is no problem, I will hurry up."
Looking at the busyness outside the window, Wang Xudong's expression seemed very calm. In fact, his heart was not calm at all, but a little excited. Seeing the rapid increase in production, he couldn't help but be excited.
.........
A domestic forum.
This is a very high-level professional forum, which gathers a lot of great masters. Everyone often uploads some awesome inventions, or awesome machinery, etc.
Such as an automated production line, such as an automated packaging line, such as a highly automated mechanical equipment, etc., and then there will be a lot of comments and messages below.
In the past few days, I don’t know who has uploaded the automatic logging equipment of a certain country in the west. This equipment is a fork, and the crawler logging equipment is basically not affected by the terrain conditions, and can be directly used to log in the mountains.
This is a ten-minute video. It can be seen from the video that this logging equipment was driven to a hillside under the operation of a big Western man, and then began to log.
A big tree was sawed down quickly. Of course, this was just the beginning. After the big tree was sawed down, the branches could be quickly removed, and the big tree could be sawn into pieces to the required size and become logs one by one. , From sawing down big trees to finished logs, one-stop, fast speed and amazing efficiency.
Many people left messages under the video. It can be seen from the tone of everyone's messages that everyone admires this logging equipment.
Hu Lin is a senior veteran of this forum. After watching this video, he didn't recover for a long time, thinking in his heart, it's too awesome.
Hu Lin thought in his heart, after seeing such a pleasing logging, he probably won't be interested in other mechanical equipment in the next few days.
Just thinking about this, the phone rang, and seeing that it was from his best friend, Hu Lin quickly connected it, and said loudly: "Dude, quickly log in to the forum, there is a kind of logging equipment, it is amazing, go and see it!" one look."
The buddy said on the phone: "I saw it, it's nothing, I sent you a link, you go and have a look, their mining equipment is called a cow."
Impossible, is there anything better than the logging equipment just now?
Hu Lin put down the phone and clicked on the link sent by his buddy. This was also a video in the forum. After clicking it, Hu Lin soon fell into it, his face full of shock.
This is actually a video of Xudong Mining's combined mining vehicle!
.........
The first one is delivered!
(End of this chapter)
There are three people in front of them, all wearing work clothes and hard hats, one of them is holding a construction design drawing in his hand, talking about something, and the two next to him nod their heads from time to time, or say something.
Those who are familiar with it will know that these three people are the project directors of this special railway line with a length of more than ten kilometers. The three people are discussing and exchanging some construction problems.
Generally speaking, the project is progressing smoothly. The roadbed has been formed in many places. There are a lot of construction machinery and a large number of workers busy on the entire railway line. A large amount of stone, cement, sand, steel bars, etc. can be seen everywhere.
Seeing these three people, Zhou Guoqiang's eyes lit up, and he immediately quickened his pace and walked towards the location of the three people. Zhou Guoqiang's assistant quickly followed.
Seeing Zhou Guoqiang walking towards him, the three of them immediately stopped communicating, and one of them said loudly: "Mr. Zhou, why did you come here in person? Do you have anything to do with us?"
Of course there is something!
Zhou Guoqiang nodded, without hiding anything, and said straight to the point: "You three, it's rare that you all happen to be together, so I'll save myself from going to inform you."
Seeing that there seemed to be something important, the three looked focused and listened attentively.Zhou Guoqiang is the general manager of the Huangtang mining area, and is the party A of the construction project of this railway line. The three of them must listen to Zhou Guoqiang in everything. It can be seen from the expressions of the three of them that they respect Zhou Guoqiang very much.
One of them, wearing gold-rimmed glasses, is the chief technical officer of this special railway line. His surname is Liu, and everyone generally calls him Chief Engineer Liu. "
Zhou Guoqiang pointed to the railway under construction in front of him: "Three, can the construction progress of this section of railway be made faster? I hope it will be completed two months earlier than the planned completion date."
Two months in advance!
The three of them were slightly startled, and really couldn't figure out why. You know, in the eyes of the three of them, the construction of this section of the railway was already progressing fast enough, yet Zhou Guoqiang actually wanted to speed it up.
Zhou Guoqiang can't wait!
In the past few days, I have been focusing on the construction of the railway, and I also take time to walk around the railway line every day, take a look, and understand the progress of the project.
So much attention is mainly due to the fact that the news of the Douliashan mining area has continuously spread to Zhou Guoqiang’s ears. Since the two combined mining vehicles, the daily output of iron ore in the Douliashan mining area has skyrocketed, 8000 on the first day More than 1000 tons, more than [-] tons on the second day, and more than [-] tons on the third day...
Yesterday, the news reached Zhou Guoqiang's ears again. The daily output of the Douliashan mining area unexpectedly reached more than [-] tons!
Zhou Guoqiang knew that the rapid increase in production capacity was mainly because of the two combined mining vehicles. If there were such two combined mining vehicles in the Huangtang mining area, Zhou Guoqiang would also have full confidence and confidence that he would be able to achieve such an output.
Zhou Guoqiang originally wanted to have a few combined mining vehicles. After seeing the daily output of the Douliashan mining area soared, he was so envious of the combined mining vehicles. He often thought in his heart, let alone a few vehicles, even one ah.
However, the boss said that the railway in the Huangtang mining area has not been built yet. If too much iron ore is mined, it will not be possible to transport so much iron ore by the current road transportation alone.
If you want to have a combined mining vehicle, the most urgent task is to build the railway. After the railway is completed, there will be a combined mining vehicle. This is what Wang Xudong personally said.
As a result, Zhou Guoqiang felt compelled to build the railway today.That's why Zhou Guoqiang approached the three project leaders and asked to speed up the project, hoping to complete it about two months ahead of the original plan.
Mr. Liu said with a distressed face: "Mr. Zhou, the project schedule is so tight. It is a bit difficult to complete the project two months ahead of schedule."
Zhou Guoqiang pointed to the mining area not far away, and said slowly: "You should also know that our mining area is developing rapidly, and a large amount of iron ore needs to be transported out. This railway is needed. It was built one day earlier, and a large amount of iron ore It can be shipped to major steel companies across the country one day earlier, and we can generate huge economic benefits one day earlier."
"Hmm." The three nodded in unison.
This point is relatively easy to understand. After staying here for such a period of time, the three of them also have a better understanding of the Huangtang mining area. They know that this place is full of high-quality iron ore, and the output is also amazing. They really need railways urgently.
One of them nodded and said firmly, "Mr. Zhou, if this is the case, then we will open night shifts and work day and night to speed up the progress of the project."
Day and night, it must be much faster.
Zhou Guoqiang agreed: "Then everyone has worked hard. When the railway is completed, I will apply for it and give you a part of the reward, which is regarded as compensation."
There is still money, and the three of them are also happy.
Then, Zhou Guoqiang explained some things, such as paying attention to safety, ensuring the quality of the project, etc. After explaining these, Zhou Guoqiang's mood suddenly improved unprecedentedly, thinking in his heart, when this railway is completed, I will go to the boss, Huangtang mining area A couple of those combined mining vehicles, too.
Thinking of the combined mining vehicle, Zhou Guoqiang began to look forward to it. In his mind, there seemed to be a huge grand blueprint slowly unfolding. His heart was filled with energy in an instant, and he walked towards the mining area with strong strides.
.........
Wang Xudong also has a grand blueprint in his mind.
In the Doulia Mountain mining area, in the office, Wang Xudong is discussing the construction of the Doulia Mountain mining area with Qin Tian. Now, Qin Tian can be said to be Wang Xudong's royal planning expert. The Doulia Mountain mining area was originally planned by Qin Tian. The mine was also planned by Qin Tian.
There are now two combined mining vehicles in the Douliashan mining area, and there will be a third, fourth, fifth and so on in the future. As the combined mining vehicles are put into use one by one in the future, the entire mining area will definitely happen again Earth-shaking changes.
In this way, it is necessary to re-plan, which is called re-planning. Strictly speaking, it should be an upgrade and expansion on the existing basis.
Standing in front of the big window of the office, Wang Xudong looked down from a high position with a wide view, pointing to the front and said, "Soon after, the entire crushing area will be demolished and become a finished iron ore storage yard, and the four-lane heavy-duty cement road that enters the mining area will be expanded. There are eight lanes, the roads in the mining area are fully widened, and the loading capacity of iron ore is increased..."
Behind Wang Xudong, Qin Tian listened carefully, keeping some of Wang Xudong's thoughts and requirements in mind. The upgrade and expansion of the mining area this time was basically in accordance with Wang Xudong's requirements, coupled with his Qin Tian's professional knowledge.
Qin Tian's posture is very low, and he keeps nodding. If there are familiar people here, seeing Qin Tian's appearance, they will definitely be surprised and exclaim, this is a proud expert Qin, it's impossible!
Just now, Qin Tian went to the mining area to have a look. Qin Tian is naturally very familiar with the entire mining area, because this was planned by Qin Tian. At the beginning, according to Wang Xudong's request, it was planned to produce [-] tons of iron ore per day. Reserve space for upgrades and extensions.
At the time of planning, Qin Tian couldn't believe it to death. The daily output here could reach [-] tons. Later, with the increase of the output of the mining area, Qin Tian gradually believed it.
After looking around just now, I was deeply shocked. The output of the entire mining area has reached more than [-] tons. I'm afraid it's not far away.
My God, it can really reach [-] tons!
In this way, Qin Tian didn't have any arrogance, he acted honestly, and admired Wang Xudong even more in his heart.
At the beginning, it was just a very small mine. It is a miracle that it has reached such an astonishing scale in less than a year.
And for this miracle to happen, he, Qin Tian, also has a share of the credit, because the planning of the entire mining area was made by him. Practice has shown that Qin Tian's planning is very scientific and reasonable, so Qin Tian felt a little excited, Even a little proud.
After listening to Wang Xudong's speech, Qin Tian nodded and said, "Mr. Wang, I will quickly complete the next stage of planning and complete the upgrade and expansion of the Doulia Mountain mining area as soon as possible."
"En." Wang Xudong nodded and said: "Take time to hurry up. You have also seen the two combined mining vehicles and know their mining efficiency. In less than a month, three more combined mining vehicles will be put into the Doulia Mountain mining area."
There are three more!
These two cars are already remarkable, and three more cars will make a total of five cars. Wouldn't it be easy to reach the scale of 10,000+ tons of iron ore per day?
Qin Tian said excitedly: "President Wang, there is no problem, I will hurry up."
Looking at the busyness outside the window, Wang Xudong's expression seemed very calm. In fact, his heart was not calm at all, but a little excited. Seeing the rapid increase in production, he couldn't help but be excited.
.........
A domestic forum.
This is a very high-level professional forum, which gathers a lot of great masters. Everyone often uploads some awesome inventions, or awesome machinery, etc.
Such as an automated production line, such as an automated packaging line, such as a highly automated mechanical equipment, etc., and then there will be a lot of comments and messages below.
In the past few days, I don’t know who has uploaded the automatic logging equipment of a certain country in the west. This equipment is a fork, and the crawler logging equipment is basically not affected by the terrain conditions, and can be directly used to log in the mountains.
This is a ten-minute video. It can be seen from the video that this logging equipment was driven to a hillside under the operation of a big Western man, and then began to log.
A big tree was sawed down quickly. Of course, this was just the beginning. After the big tree was sawed down, the branches could be quickly removed, and the big tree could be sawn into pieces to the required size and become logs one by one. , From sawing down big trees to finished logs, one-stop, fast speed and amazing efficiency.
Many people left messages under the video. It can be seen from the tone of everyone's messages that everyone admires this logging equipment.
Hu Lin is a senior veteran of this forum. After watching this video, he didn't recover for a long time, thinking in his heart, it's too awesome.
Hu Lin thought in his heart, after seeing such a pleasing logging, he probably won't be interested in other mechanical equipment in the next few days.
Just thinking about this, the phone rang, and seeing that it was from his best friend, Hu Lin quickly connected it, and said loudly: "Dude, quickly log in to the forum, there is a kind of logging equipment, it is amazing, go and see it!" one look."
The buddy said on the phone: "I saw it, it's nothing, I sent you a link, you go and have a look, their mining equipment is called a cow."
Impossible, is there anything better than the logging equipment just now?
Hu Lin put down the phone and clicked on the link sent by his buddy. This was also a video in the forum. After clicking it, Hu Lin soon fell into it, his face full of shock.
This is actually a video of Xudong Mining's combined mining vehicle!
.........
The first one is delivered!
(End of this chapter)
You'll Also Like
-
Fairy Tail: Start by accepting the Royal Knights
Chapter 203 8 hours ago -
Just after cultivating the Purple Sky Divine Thunder, I encountered the Night Parade of Hundred Demo
Chapter 212 8 hours ago -
The mysterious apocalypse is coming, fortunately I have a simulator
Chapter 244 8 hours ago -
Everyone: The blood volume is trillions, how do you deal with it?
Chapter 284 8 hours ago -
Food: Random stalls, customers chase me for ten blocks
Chapter 209 8 hours ago -
Football's No. 1 Prodigal Son
Chapter 201 8 hours ago -
Pokémon: Shiny Attractor
Chapter 635 8 hours ago -
Top torture! Being kidnapped by the arrogant lady and taken home
Chapter 269 8 hours ago -
Naruto: The Strongest Sage
Chapter 205 8 hours ago -
Super Rich: Pick up trillions of assets at the beginning
Chapter 200 8 hours ago